ADU Permit Submission Checklist in Mesa, Arizona

Everything you need to apply for a adu permit in Mesa, Arizona — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$3,300 – $10,725
Review time
Varies by jurisdiction
Inspections
7 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

ADU Permit Checklist

Mesa6 required, 0 optional

Forms & Applications(1)

  • Building Permit ApplicationREQUIRED[1][2]

    Completed Mesa building permit application form with property identification and project description

Plans & Diagrams(4)

  • Architectural PlansREQUIRED[3][4]

    Complete architectural drawings signed and sealed by a licensed Arizona architect, including floor plans, elevations, sections, and material specifications

  • Site PlanREQUIRED[5][6]

    Accurate site plan showing property lines, building footprint, setbacks, parking areas, driveways, and utility locations scaled to at least 1/16 inch

  • Zoning Verification ReportREQUIRED[7][8]

    Zoning verification letter from Mesa Planning showing property zoning and ADU eligibility per HB 2674

  • Electrical PlansREQUIRED[11][12]

    Electrical plan prepared by a licensed Arizona electrical engineer or contractor showing panel, circuits, and service sizing

Supporting Documents(1)

  • Structural CalculationsREQUIRED[9][10]

    Structural calculations and engineering report prepared by a licensed Arizona structural engineer for ADU construction

This checklist is for reference only. Requirements may change — always verify with Mesa before submission.

Avoid rejections — generate a submission-ready packet

Get a personalized ADU permit packet for Mesa, Arizona — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,100–$6,500 estimated total
  • Step-by-step Mesa Development Services Department portal submission guide
  • Inspection prep checklist (7 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Mesa requires the following documents for this permit application.

R

Building Permit Application

Completed Mesa building permit application form with property identification and project description

R

Architectural Plans

Complete architectural drawings signed and sealed by a licensed Arizona architect, including floor plans, elevations, sections, and material specifications

R

Site Plan

Accurate site plan showing property lines, building footprint, setbacks, parking areas, driveways, and utility locations scaled to at least 1/16 inch

R

Zoning Verification Report

Zoning verification letter from Mesa Planning showing property zoning and ADU eligibility per HB 2674

R

Structural Calculations

Structural calculations and engineering report prepared by a licensed Arizona structural engineer for ADU construction

R

Electrical Plans

Electrical plan prepared by a licensed Arizona electrical engineer or contractor showing panel, circuits, and service sizing

Permit Process

Follow these steps to submit your permit application through Mesa Development Services Department.

  1. 1

    Zoning Eligibility Review

    Request zoning verification from Mesa Planning Division to confirm ADU eligibility per HB 2674 for specific zoning district

    You'll need: Zoning Verification Report

  2. 2

    Submit Building Permit Application

    Submit complete building permit application with architectural, structural, and electrical plans to Mesa Development Services

    You'll need: Building Permit Application, Architectural Plans, Site Plan, Structural Calculations, Electrical Plans

  3. 3

    Plan Review

    Development Services staff performs plan review against Arizona Building Code and Mesa zoning requirements

  4. 4

    Respond to Plan Review Comments

    Revise and resubmit plans if staff identifies code compliance or design issues

  5. 5

    Permit Issuance and Fee Payment

    Pay applicable permit fees and receive building permit authorization for construction

  6. 6

    Construction Inspections

    Coordinate and pass all required inspections throughout construction: foundation, framing, electrical, plumbing, mechanical, and final

  7. 7

    Final Inspection and Certificate

    Pass final inspection and receive Certificate of Occupancy from Mesa

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$2,200 – $6,500Verified
Plan Review Fee$1,100 – $4,225Verified

Inspections Required

Foundation inspection and soil compaction verification

Foundation inspection and soil compaction verification

Framing inspection for structural integrity and Arizona wind

Framing inspection for structural integrity and Arizona wind loads

Electrical system rough-in and service panel sizing

Electrical system rough-in and service panel sizing

Plumbing rough-in for separate meter requirements

Plumbing rough-in for separate meter requirements

Mechanical systems and HVAC installation

Mechanical systems and HVAC installation

Energy Code compliance (Arizona Energy Code)

Energy Code compliance (Arizona Energy Code)

Final inspection for occupancy approval

Final inspection for occupancy approval

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Mesa Development Services Department

Last verified: February 15, 2026

2 sources referenced

Official page
Portal guide
Official page
Mesa Development Services Resources

Verified February 15, 2026

Fee schedule
Mesa Development Services Fee Schedule

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Mesa?
Yes. Mesa requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Mesa?
Processing times in Mesa vary depending on project complexity and current review volume. The process involves 7 steps. Contact Mesa Development Services for current timelines.
What documents are required for a adu permit in Mesa?
Mesa requires 6 documents including Building Permit Application, Architectural Plans, Site Plan, Zoning Verification Report, and others. See the full list above for details.
What happens if I build without a adu permit in Mesa?
Building without a permit in Mesa can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Mesa?
Yes. PermitMagic generates a submission-ready packet tailored to Mesa's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Mesa?
ADU permit fees in Mesa typically range from $3,300 to $10,725, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Mesa.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Mesa, Arizona — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download