ADU Permit Fees & Costs in Scottsdale, Arizona
Everything you need to apply for a adu permit in Scottsdale, Arizona — documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $3,750 – $12,375
- Review time
- Varies by jurisdiction
- Inspections
- 6 inspections required
Limited Data Available
Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Scottsdale directly.
Estimated Total Fees
$3,750 – $12,375
Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.
| Fee Component | Range | Confidence |
|---|---|---|
| ADU Permit Fee[1][2] Permit fees based on construction valuation per Scottsdale fee schedule. Building permit, plan review, and inspection fees included. Impact fees may apply for utilities and infrastructure. | $2,500 – $7,500 | ✓ |
| Plan Review Fee[3][4] Plan review fee is typically 50-65% of the permit fee. | $1,250 – $4,875 | ✓ |
| Estimated Total | $3,750 – $12,375 |
Fees shown as ranges. Always verify the exact amount with Scottsdale before submission. Additional fees may apply for expedited review or resubmittals.
Avoid rejections — generate a submission-ready packet
Get a personalized ADU permit packet for Scottsdale, Arizona — tailored to your project details.
- Required forms: Building Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $1,250–$7,500 estimated total
- Step-by-step City of Scottsdale Planning and Development Services portal submission guide
- Inspection prep checklist (6 items)
- Personalized for your specific project details
Free to preview · Pro to download
Required Documents
Scottsdale requires the following documents for this permit application.
Building Permit Application
Completed City of Scottsdale building permit application with complete project description, property owner contact information, and construction cost estimates
Architectural Drawings
Complete architectural plans signed by a licensed Arizona architect, including floor plans, elevations, sections, and construction details with compliance notes
Site Plan
Site plan showing property boundaries, dimensions, building footprint, setbacks, parking layout, access routes, and existing utilities
Zoning Verification Letter
Zoning verification letter from Scottsdale Planning confirming property zoning district and ADU eligibility under current zoning ordinance
Structural Engineering Plans
Structural engineering plans and calculations by a licensed Arizona professional engineer for foundation, framing, and load-bearing elements
Mechanical and Utility Plans
Plans showing water supply, sewer, electrical, gas connections and separate metering for water, electric, and gas services to ADU
Proof of Property Ownership
Current property deed or title commitment showing applicant ownership of subject property
Permit Process
Follow these steps to submit your permit application through City of Scottsdale Planning and Development Services.
- 1
Zoning Eligibility Verification
Obtain zoning verification letter from Scottsdale Planning confirming ADU is allowed in property zoning district and meets dimensional requirements
You'll need: Zoning Verification Letter, Proof of Property Ownership
- 2
Submit Building Permit Application
Submit complete permit application with architectural, structural, utility plans and all required supporting documentation to Scottsdale Planning and Development
You'll need: Building Permit Application, Architectural Drawings, Site Plan, Structural Engineering Plans, Mechanical and Utility Plans
- 3
Plan Review and Approval
Scottsdale Planning conducts comprehensive plan review for compliance with zoning ordinance, Arizona Building Code, and design standards
- 4
Address Plan Review Comments
Revise and resubmit plans as needed to address any code compliance issues or comments raised during plan review
- 5
Permit Issuance and Payment
Pay all permit fees and receive approved building permit authorizing construction to begin
- 6
Construction Inspections
Schedule and pass required inspections: foundation, framing, electrical, plumbing, mechanical, and final inspection per Arizona Building Code
- 7
Certificate of Occupancy
Receive Certificate of Occupancy from Scottsdale Building Official upon successful final inspection and code compliance verification
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
City of Scottsdale Planning and Development Services
Last verified: February 15, 2026
2 sources referenced
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a adu permit in Scottsdale?
- Yes. Scottsdale requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does adu permit approval take in Scottsdale?
- Processing times in Scottsdale vary depending on project complexity and current review volume. The process involves 7 steps. Contact Scottsdale Development Services for current timelines.
- What documents are required for a adu permit in Scottsdale?
- Scottsdale requires 7 documents including Building Permit Application, Architectural Drawings, Site Plan, Zoning Verification Letter, and others. See the full list above for details.
- What happens if I build without a adu permit in Scottsdale?
- Building without a permit in Scottsdale can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my adu permit submission in Scottsdale?
- Yes. PermitMagic generates a submission-ready packet tailored to Scottsdale's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a adu permit cost in Scottsdale?
- ADU permit fees in Scottsdale typically range from $3,750 to $12,375, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Scottsdale.
Related Permits
Other permits in Scottsdale
Ready to apply? Build your submission packet.
Answer a few project questions and get a adu permit packet for Scottsdale, Arizona — with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview · Pro to download