EV Charger Permit Requirements in Bakersfield, California

Everything you need to apply for a ev charger permit in Bakersfield, California โ€” documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$300 โ€“ $545
Review time
Varies by jurisdiction
Inspections
4 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Permit Requirements (5 items)

5 required

๐Ÿ“‹ Forms & Applications(2)

๐Ÿ“ Plans & Diagrams(1)

๐Ÿ“„ Supporting Documents(2)

Generate your permit packet

Get a personalized EV Charger permit packet for Bakersfield, California โ€” tailored to your project details.

  • Required forms: EV Charger Electrical Permit Application, Licensed Electrician Information, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $100โ€“$330 estimated total
  • Step-by-step Bakersfield Planning & Community Development Department portal submission guide
  • Inspection prep checklist (4 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview ยท Pro to download

Permit Process

Follow these steps to submit your permit application through Bakersfield Planning & Community Development Department.

  1. 1

    Engage Licensed Electrician

    Hire California-licensed electrician to design and plan EV charger installation per NEC Article 625

    You'll need: Licensed Electrician Information

  2. 2

    Prepare & Submit Documentation

    Prepare load calculation, site plan, and equipment specifications. Submit through Bakersfield online portal.

    You'll need: EV Charger Electrical Permit Application, Electrical Load Calculation, Site Plan & Installation Diagram, Equipment Specifications & Listing

  3. 3

    Plan Review

    Bakersfield Planning & Community Development reviews for NEC compliance, dedicated circuit sizing, GFCI protection, and accessibility requirements

  4. 4

    Pay Permit Fee & Receive Permit

    Pay electrical permit fee (typically $200-$330 for residential EV chargers). Permit valid for 180 days.

  5. 5

    Schedule Inspections

    Schedule rough-in inspection (before EVSE installation) and final inspection (after all connections complete)

  6. 6

    Inspection & Final Approval

    Pass electrical rough-in and final inspections. Receive inspection approval and permit sign-off.

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
EV Charger Permit Fee$200 โ€“ $330Verified
Plan Review Fee$100 โ€“ $215Verified

Inspections Required

Dedicated 40-50 amp circuit breaker properly labeled

Dedicated 40-50 amp circuit breaker properly labeled

GFCI protection installed and operational at outlet or break

GFCI protection installed and operational at outlet or breaker

Proper wire gauge (8 AWG minimum for 50 amp circuit) install

Proper wire gauge (8 AWG minimum for 50 amp circuit) installed in protective conduit

EVSE mounted securely at proper height with adequate clearan

EVSE mounted securely at proper height with adequate clearance from obstructions

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Bakersfield Planning & Community Development Department

Last verified: February 15, 2026

2 sources referenced

Portal guide
Bakersfield Permits Portal

Verified February 15, 2026

Official page
Official page

Frequently Asked Questions

Do I need a ev charger permit in Bakersfield?
Yes. Bakersfield requires a ev charger permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does ev charger permit approval take in Bakersfield?
Processing times in Bakersfield vary depending on project complexity and current review volume. The process involves 6 steps. Contact Bakersfield Development Services for current timelines.
What documents are required for a ev charger permit in Bakersfield?
Bakersfield requires 5 documents including EV Charger Electrical Permit Application, Electrical Load Calculation, Site Plan & Installation Diagram, Equipment Specifications & Listing, and others. See the full list above for details.
What happens if I build without a ev charger permit in Bakersfield?
Building without a permit in Bakersfield can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my ev charger permit submission in Bakersfield?
Yes. PermitMagic generates a submission-ready packet tailored to Bakersfield's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a ev charger permit cost in Bakersfield?
EV Charger permit fees in Bakersfield typically range from $300 to $545, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Bakersfield.

Related Permits

EV Charger permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a ev charger permit packet for Bakersfield, California โ€” with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview ยท Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]Bakersfield Planning & Community Development Department โ€” Bakersfield Planning & Community Development - Electrical Permitshttps://www.bakersfieldca.gov/planning(verified Feb 15, 2026)
  2. [2]Bakersfield Planning & Community Development Department โ€” Bakersfield Permits Portalhttps://www.bakersfieldca.gov/permits(verified Feb 15, 2026)
  3. [3]Bakersfield Planning & Community Development Department โ€” Bakersfield Municipal Code - Electrical Safetyhttps://www.bakersfieldca.gov/planning/code(verified Feb 15, 2026)
  4. [4]Bakersfield Planning & Community Development Department โ€” Bakersfield EV Charger Installation Checklisthttps://www.bakersfieldca.gov/planning/ev-checklist(verified Feb 15, 2026)