ADU Permit Requirements in Long Beach, California

Everything you need to apply for a adu permit in Long Beach, California โ€” documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$6,300 โ€“ $20,625
Review time
Varies by jurisdiction
Inspections
7 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Permit Requirements (6 items)

6 required

๐Ÿ“‹ Forms & Applications(1)

๐Ÿ“ Plans & Diagrams(3)

๐Ÿ“„ Supporting Documents(2)

Generate your permit packet

Get a personalized ADU permit packet for Long Beach, California โ€” tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $2,100โ€“$12,500 estimated total
  • Step-by-step Long Beach Development Services Department portal submission guide
  • Inspection prep checklist (7 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview ยท Pro to download

Permit Process

Follow these steps to submit your permit application through Long Beach Development Services Department.

  1. 1

    Pre-Application Review

    Consult with Long Beach Development Services staff to verify ADU eligibility, zoning compliance, and confirm project meets all local requirements

    You'll need: Property Deed and Title

  2. 2

    Submit Building Permit Application and Plans

    Submit complete permit application with architectural, structural engineering, and MEP documents to Development Services

    You'll need: Building Permit Application, Architectural Plans, Site Plan, Structural Engineering Report, Mechanical, Electrical, and Plumbing Plans

  3. 3

    Plan Review and Compliance Verification

    Building and Planning staff review plans for compliance with Long Beach Municipal Code Chapter 21, California Building Code, and state ADU law

  4. 4

    Address Revisions and Staff Comments

    Submit revised plans if staff identifies code compliance issues or requires additional information

  5. 5

    Pay Permit and Inspection Fees

    Pay permit issuance and plan review fees based on construction valuation

  6. 6

    Construction Inspections

    Schedule and pass required building inspections: foundation, framing, electrical, plumbing, mechanical, and final

  7. 7

    Final Inspection and Certificate of Occupancy

    Receive Certificate of Occupancy upon passing final inspection and code compliance verification

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$4,200 โ€“ $12,500Verified
Plan Review Fee$2,100 โ€“ $8,125Verified

Inspections Required

Foundation and footing installation per California Building

Foundation and footing installation per California Building Code standards

Structural framing, connections, and integrity verification

Structural framing, connections, and integrity verification

Electrical system rough-in, panel installation, and final in

Electrical system rough-in, panel installation, and final inspection

Plumbing rough-in, water line sizing, and final connections

Plumbing rough-in, water line sizing, and final connections

Mechanical systems, HVAC, and ventilation installation

Mechanical systems, HVAC, and ventilation installation

Roof framing, sheathing, and waterproofing protection

Roof framing, sheathing, and waterproofing protection

Final comprehensive inspection and Certificate of Occupancy

Final comprehensive inspection and Certificate of Occupancy issuance

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Long Beach Development Services Department

Last verified: February 15, 2026

2 sources referenced

Official page
Portal guide
Long Beach Online Permit Services

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Long Beach?
Yes. Long Beach requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Long Beach?
Processing times in Long Beach vary depending on project complexity and current review volume. The process involves 7 steps. Contact Long Beach Development Services for current timelines.
What documents are required for a adu permit in Long Beach?
Long Beach requires 6 documents including Building Permit Application, Architectural Plans, Site Plan, Structural Engineering Report, and others. See the full list above for details.
What happens if I build without a adu permit in Long Beach?
Building without a permit in Long Beach can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Long Beach?
Yes. PermitMagic generates a submission-ready packet tailored to Long Beach's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Long Beach?
ADU permit fees in Long Beach typically range from $6,300 to $20,625, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Long Beach.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Long Beach, California โ€” with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview ยท Pro to download