ADU Permit Online Portal Guide in Los Angeles, California

Everything you need to apply for a adu permit in Los Angeles, California — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$4,500 – $14,025
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

LADBS

Verified

7-step online submission process — account registration required[1][2]

Open Portal

Step 1: Pre-Design Meeting

[3][4]

Consult with LADBS to confirm ADU eligibility and applicable requirements under state and local law

Portal steps may change without notice. Always confirm the current process at Los Angeles's online portal.

Generate your permit packet

Get a personalized ADU permit packet for Los Angeles, California — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,500–$8,500 estimated total
  • Step-by-step LADBS portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Los Angeles requires the following documents for this permit application.

R

Building Permit Application

Los Angeles building permit application. LA is national leader in ADU permitting with SB 13, AB 68, AB 881 streamlining.

R

Architectural Plans

Architectural plans prepared by California licensed architect with ADU-specific requirements per LA Building Code

R

Site Plan

Site plan showing property boundaries, setbacks, building footprint, parking, utilities, and lot coverage

R

Structural Design and Calculations

Structural design sealed by California licensed structural engineer

R

Mechanical, Electrical, Plumbing Plans

MEP plans showing water, sewer, electric, gas connections with separate metering specifications

R

Title 24 and CALGreen Compliance

California Title 24 energy code and CALGreen sustainability compliance documentation

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$3,000 – $8,500Verified
Plan Review Fee$1,500 – $5,525Verified

Inspections Required

Foundation and soil inspection per California Building Code

Foundation and soil inspection per California Building Code

Framing inspection for structural adequacy and fire-rating s

Framing inspection for structural adequacy and fire-rating separation

Electrical installation and service panel inspection

Electrical installation and service panel inspection

Plumbing rough-in and fixture connection inspection

Plumbing rough-in and fixture connection inspection

Mechanical, HVAC, and water heater inspection

Mechanical, HVAC, and water heater inspection

Final inspection with Title 24 energy and CALGreen complianc

Final inspection with Title 24 energy and CALGreen compliance verification

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

LADBS

Last verified: February 15, 2026

2 sources referenced

Official page
Portal guide
Official page

Frequently Asked Questions

Do I need a adu permit in Los Angeles?
Yes. Los Angeles requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Los Angeles?
Processing times in Los Angeles vary depending on project complexity and current review volume. The process involves 7 steps. Contact Los Angeles Development Services for current timelines.
What documents are required for a adu permit in Los Angeles?
Los Angeles requires 6 documents including Building Permit Application, Architectural Plans, Site Plan, Structural Design and Calculations, and others. See the full list above for details.
What happens if I build without a adu permit in Los Angeles?
Building without a permit in Los Angeles can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Los Angeles?
Yes. PermitMagic generates a submission-ready packet tailored to Los Angeles's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Los Angeles?
ADU permit fees in Los Angeles typically range from $4,500 to $14,025, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Los Angeles.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Los Angeles, California — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]LADBSCalifornia SB 13 & AB 68 - State ADU Streamlining Lawshttps://www.ladbs.org(verified Feb 15, 2026)
  2. [2]LADBSLADBS Online Services and ePermit Portalhttps://www.ladbs.org/services/online-services(verified Feb 15, 2026)
  3. [3]LADBSLADBS ADU Permitting Guidelines and Checklistshttps://www.ladbs.org(verified Feb 15, 2026)