Solar PV Permit Fees & Costs in Modesto, California

Everything you need to apply for a solar pv permit in Modesto, California — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$188 – $619
Review time
Varies by jurisdiction
Inspections
5 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Modesto directly.

Estimated Total Fees

$188$619

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
Solar PV Permit Fee[1][2]

Modesto fees based on permit class; residential solar $175-$300

$125 – $375
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$63 – $244
Estimated Total$188$619

Fees shown as ranges. Always verify the exact amount with Modesto before submission. Additional fees may apply for expedited review or resubmittals.

Avoid rejections — generate a submission-ready packet

Get a personalized Solar PV permit packet for Modesto, California — tailored to your project details.

  • Required forms: Solar Permit Application, NEM Interconnection Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $63–$375 estimated total
  • Step-by-step City of Modesto Community and Economic Development portal submission guide
  • Inspection prep checklist (5 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Modesto requires the following documents for this permit application.

R

Solar Permit Application

Modesto standard solar installation permit application

R

Site and Roof Plans

Scaled drawings with solar array layout and dimensions

R

Electrical Schematic Diagram

Single-line diagram showing all electrical connections

R

Equipment Specifications

Manufacturer specs for modules, inverter, and hardware

R

Structural Design Verification

PE-certified structural engineering certification

R

Title 24 Energy Compliance

California Title 24 standards compliance report

R

NEM Interconnection Application

PG&E Net Energy Metering interconnection request

Permit Process

Follow these steps to submit your permit application through City of Modesto Community and Economic Development.

  1. 1

    In-Person Application Submission

    Submit solar permit application in-person to CED office

    You'll need: Solar Permit Application

  2. 2

    Plan Review and Technical Evaluation

    Review of design, structural adequacy, and energy code compliance

    You'll need: Site and Roof Plans, Electrical Schematic Diagram, Equipment Specifications, Structural Design Verification, Title 24 Energy Compliance

  3. 3

    Utility Interconnection Study

    PG&E reviews and approves Net Energy Metering request

    You'll need: NEM Interconnection Application

  4. 4

    Permit Issuance

    CED issues approved solar installation permit

  5. 5

    Solar System Installation

    Licensed contractors complete installation per approved plans

  6. 6

    Final Inspections and Permission to Operate

    Final building and electrical inspections, PG&E PTO

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Modesto Community and Economic Development

Last verified: February 15, 2026

2 sources referenced

Official page
Modesto Building Permits

Verified February 15, 2026

Official page
Solar Installation Requirements

Verified February 15, 2026

Portal guide
PG&E Solar and Renewable Energy

Verified February 15, 2026

Frequently Asked Questions

Do I need a solar pv permit in Modesto?
Yes. Modesto requires a solar pv permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does solar pv permit approval take in Modesto?
Processing times in Modesto vary depending on project complexity and current review volume. The process involves 6 steps. Contact Modesto Development Services for current timelines.
What documents are required for a solar pv permit in Modesto?
Modesto requires 7 documents including Solar Permit Application, Site and Roof Plans, Electrical Schematic Diagram, Equipment Specifications, and others. See the full list above for details.
What happens if I build without a solar pv permit in Modesto?
Building without a permit in Modesto can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my solar pv permit submission in Modesto?
Yes. PermitMagic generates a submission-ready packet tailored to Modesto's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a solar pv permit cost in Modesto?
Solar PV permit fees in Modesto typically range from $188 to $619, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Modesto.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a solar pv permit packet for Modesto, California — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download