ADU Permit Online Portal Guide in Sacramento, California
Everything you need to apply for a adu permit in Sacramento, California — documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $5,700 – $18,150
- Review time
- Varies by jurisdiction
- Inspections
- 7 inspections required
Sacramento Community Development Department
Verified7-step online submission process — account registration required[1][2]
Open PortalPortal steps may change without notice. Always confirm the current process at Sacramento's online portal.
Generate your permit packet
Get a personalized ADU permit packet for Sacramento, California — tailored to your project details.
- Required forms: Building Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $1,900–$11,000 estimated total
- Step-by-step Sacramento Community Development Department portal submission guide
- Inspection prep checklist (7 items)
- Personalized for your specific project details
Free to preview · Pro to download
Required Documents
Sacramento requires the following documents for this permit application.
Building Permit Application
Completed Building Permit Application with owner signature and contractor information
Architectural Plans
Complete architectural drawings signed and stamped by a California-licensed architect, including floor plans, elevations, sections, and all required details
Site Plan
Site plan showing property lines, dimensions, setbacks, building footprint, parking layout, driveway, landscaping, and utility locations
Structural Engineering Report
Structural calculations and engineering report prepared by a California-licensed structural engineer, including foundation design and load calculations
Utility and MEP Plans
Plans showing water, sewer, electrical, gas, and other utility connections with separate meter details and locations
Property Deed and Title
Current property deed and evidence of title ownership
Fees and Timeline
Fee Breakdown
| Fee | Range | Confidence |
|---|---|---|
| ADU Permit Fee | $3,800 – $11,000 | Verified |
| Plan Review Fee | $1,900 – $7,150 | Verified |
Inspections Required
Foundation and footing installation per California Building
Foundation and footing installation per California Building Code standards
Structural framing, members, and connections
Structural framing, members, and connections
Electrical system rough-in and final inspection with code co
Electrical system rough-in and final inspection with code compliance
Plumbing rough-in, connections, and final inspection
Plumbing rough-in, connections, and final inspection
Mechanical systems including HVAC installation and ductwork
Mechanical systems including HVAC installation and ductwork
Roof and exterior waterproofing
Roof and exterior waterproofing
Final comprehensive inspection and Certificate of Occupancy
Final comprehensive inspection and Certificate of Occupancy
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a adu permit in Sacramento?
- Yes. Sacramento requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does adu permit approval take in Sacramento?
- Processing times in Sacramento vary depending on project complexity and current review volume. The process involves 7 steps. Contact Sacramento Development Services for current timelines.
- What documents are required for a adu permit in Sacramento?
- Sacramento requires 6 documents including Building Permit Application, Architectural Plans, Site Plan, Structural Engineering Report, and others. See the full list above for details.
- What happens if I build without a adu permit in Sacramento?
- Building without a permit in Sacramento can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my adu permit submission in Sacramento?
- Yes. PermitMagic generates a submission-ready packet tailored to Sacramento's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a adu permit cost in Sacramento?
- ADU permit fees in Sacramento typically range from $5,700 to $18,150, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Sacramento.
Related Permits
Other permits in Sacramento
ADU permits in nearby cities
Ready to apply? Build your submission packet.
Answer a few project questions and get a adu permit packet for Sacramento, California — with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview · Pro to download