Solar PV Permit Fees & Costs in San Bernardino, California
Everything you need to apply for a solar pv permit in San Bernardino, California — documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $300 – $743
- Review time
- Varies by jurisdiction
- Inspections
- 4 inspections required
Limited Data Available
Some information on this page has not been fully verified. We're working to improve data quality. Always verify with San Bernardino directly.
Estimated Total Fees
$300 – $743
Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.
| Fee Component | Range | Confidence |
|---|---|---|
| Solar PV Permit Fee[1][2] Fees vary by system size and complexity; renewable energy systems may be eligible for fee waivers | $200 – $450 | ✓ |
| Plan Review Fee[3][4] Plan review fee is typically 50-65% of the permit fee. | $100 – $293 | ✓ |
| Estimated Total | $300 – $743 |
Fees shown as ranges. Always verify the exact amount with San Bernardino before submission. Additional fees may apply for expedited review or resubmittals.
Avoid rejections — generate a submission-ready packet
Get a personalized Solar PV permit packet for San Bernardino, California — tailored to your project details.
- Required forms: Solar Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $100–$450 estimated total
- Step-by-step City of San Bernardino Community Development Department portal submission guide
- Inspection prep checklist (4 items)
- Personalized for your specific project details
Free to preview · Pro to download
Required Documents
San Bernardino requires the following documents for this permit application.
Solar Permit Application
San Bernardino solar installation permit application form
Site Plan with System Layout
Site plan showing solar PV array locations, roof dimensions, and setbacks
Electrical Single-Line Diagram
Complete electrical diagram with all breakers, disconnects, and grounding shown
Solar Equipment Specifications
Manufacturer specification sheets for all solar modules and inverters
Structural Engineer Letter
Licensed structural engineer certification of roof structural capacity
Title 24 Energy Compliance
Title 24 compliance documentation and energy performance calculations
NEM Interconnection Request
Net Energy Metering application form and documentation
Permit Process
Follow these steps to submit your permit application through City of San Bernardino Community Development Department.
- 1
Application and Documentation Submittal
Submit complete permit application with site plan and structural verification
You'll need: Solar Permit Application, Site Plan with System Layout, Structural Engineer Letter
- 2
Building and Electrical Review
Detailed review of construction documents for code compliance
You'll need: Electrical Single-Line Diagram, Solar Equipment Specifications
- 3
Energy Code Compliance Review
Verify Title 24 compliance and energy efficiency requirements
You'll need: Title 24 Energy Compliance
- 4
Utility Interconnection
Coordinate with utility company for NEM approval if grid-tied system
You'll need: NEM Interconnection Request
- 5
Final Inspection
Perform final inspection of completed solar installation
- 6
Permit Certificate Issuance
Issue final permit certificate upon successful inspection
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
City of San Bernardino Community Development Department
Last verified: February 15, 2026
2 sources referenced
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a solar pv permit in San Bernardino?
- Yes. San Bernardino requires a solar pv permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does solar pv permit approval take in San Bernardino?
- Processing times in San Bernardino vary depending on project complexity and current review volume. The process involves 6 steps. Contact San Bernardino Development Services for current timelines.
- What documents are required for a solar pv permit in San Bernardino?
- San Bernardino requires 7 documents including Solar Permit Application, Site Plan with System Layout, Electrical Single-Line Diagram, Solar Equipment Specifications, and others. See the full list above for details.
- What happens if I build without a solar pv permit in San Bernardino?
- Building without a permit in San Bernardino can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my solar pv permit submission in San Bernardino?
- Yes. PermitMagic generates a submission-ready packet tailored to San Bernardino's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a solar pv permit cost in San Bernardino?
- Solar PV permit fees in San Bernardino typically range from $300 to $743, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with San Bernardino.
Related Permits
Other permits in San Bernardino
Ready to apply? Build your submission packet.
Answer a few project questions and get a solar pv permit packet for San Bernardino, California — with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview · Pro to download