Solar PV Permit Inspection Checklist in San Diego, California

Everything you need to apply for a solar pv permit in San Diego, California — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$274 – $894
Review time
Varies by jurisdiction
Inspections
8 inspections required
VerifiedLast verified: Feb 15, 20266 verified sources

Inspection Checklist (8 items)

Before the Inspector Arrives(2)

  • Verify all NEC labels installed[1][2]

    All NEC-required labels and placards must be installed at main panel, disconnects, inverter, and conduit runs before inspection.

  • Verify fire access pathways[3][4]

    Confirm solar array installation meets fire department access pathway requirements. Inspector will verify setbacks from ridge, hips, and valleys.

🔍 Day-of Inspection(4)

  • Confirm equipment matches plans[5][6]

    Installed equipment (modules, inverter, racking) must match the approved plans. Serial numbers and models should be verifiable.

  • Test rapid shutdown system[7][8]

    Inspector may test the rapid shutdown system to verify it functions correctly per NEC 690.12.

  • Verify grounding and bonding[9][10]

    Inspector will verify equipment grounding conductors, grounding electrode conductors, and module/racking bonding.

  • Have approved plans on site[15]

    A copy of the approved permit plans must be available on site during inspection. Digital copies on a tablet are typically acceptable.

⚠️ Common Failure Points(2)

  • !
    Missing or incorrect NEC labels[11][12]

    Most common fail reason: labels missing, placed incorrectly, or with wrong content. Double-check all label locations against NEC 690.56 before inspection.

  • !
    Wiring not secured or exposed[13][14]

    Exposed or improperly secured wiring is a common fail. Ensure all conductors are properly routed, supported, and protected.

Inspection requirements may vary by project. Always confirm specific inspection criteria with your inspector or local AHJ.

Avoid rejections — generate a submission-ready packet

Get a personalized Solar PV permit packet for San Diego, California — tailored to your project details.

  • Required forms: Permit Application, Electrical Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet, Site Plan Template
  • Fee breakdown: $5–$500 estimated total
  • Step-by-step OpenDSD portal submission guide
  • Inspection prep checklist (8 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

San Diego requires the following documents for this permit application.

R

Permit Application

Standard City of San Diego permit application form for solar PV installation.

R

Electrical Permit Application

Electrical permit application required for all solar PV system installations.

R

Solar PV Checklist

DSD-specific checklist form for solar PV permit submissions.

R

Site Plan

Scaled drawing showing property layout, building footprint, and proposed solar array placement.

R

Roof Layout / Module Plan

Detailed plan showing individual module placement, dimensions, and spacing on the roof surface.

R

Single-Line Electrical Diagram

Electrical diagram showing PV system components, conductors, disconnects, and utility interconnection.

R

Structural Attachment Detail

Cross-section drawing showing how solar racking attaches to the roof structure.

R

Module Specification Sheet

Manufacturer specification sheet for the solar modules being installed.

R

Inverter Specification Sheet

Manufacturer specification sheet for the inverter(s) being installed.

R

Racking Specification Sheet

Manufacturer specification and engineering letter for the racking/mounting system.

R

Load Calculation Worksheet

Calculation showing existing electrical load and capacity for the solar system addition.

R

NEC Labeling Plan

Plan showing locations and content of all required NEC warning labels and placards.

R

Existing Electrical Panel Photo

Photograph of the existing main electrical panel showing available breaker spaces and labeling.

Optional / Conditional

O

Three-Line Electrical Diagram

Detailed electrical diagram showing all conductors, grounding, and protection devices.

O

Structural Engineering Letter

Letter from a licensed structural engineer confirming the roof can support the proposed system.

Permit Process

Follow these steps to submit your permit application through OpenDSD.

  1. 1

    Create OpenDSD Account

    Register for an account on the OpenDSD portal. You will need a valid email address. If you already have an account, skip to Step 2.

    You'll need: Email address, Phone number

  2. 2

    Start New Permit Application

    Log into OpenDSD and select "Apply for a Permit." Choose "Electrical" as the permit type and "Solar Photovoltaic" as the work description.

    You'll need: OpenDSD login credentials

  3. 3

    Enter Project Details

    Fill in the project address, property owner information, contractor license number, and system details (kW size, number of modules, inverter type).

    You'll need: Project address (APN), Property owner name and contact, Contractor license number (CSLB), System size in kW, Number of modules, Inverter manufacturer and model

  4. 4

    Upload Documents

    Upload all required documents per the checklist. Files must be PDF format. Name files descriptively (e.g., "SitePlan_123MainSt.pdf"). Each file must be under 50MB.

    You'll need: All documents from the permit checklist in PDF format, Each file named descriptively, Each file under 50MB

  5. 5

    Pay Permit Fees

    Pay the permit and plan check fees online via credit card. The system will calculate the fees based on your project valuation.

    You'll need: Credit or debit card for payment

  6. 6

    Submit and Confirm

    Review all information and documents, then click "Submit." You will receive a confirmation email with your permit application number. Save this number for tracking.

    You'll need: All previous steps completed

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Building Permit Fee$150 – $500Verified
Plan Check Fee$100 – $350Verified
Technology Fee$19 – $19Verified
Strong Motion Instrumentation Fee$5 – $25Verified

Inspections Required

Verify all NEC labels installed

All NEC-required labels and placards must be installed at main panel, disconnects, inverter, and conduit runs before inspection.

Verify fire access pathways

Confirm solar array installation meets fire department access pathway requirements. Inspector will verify setbacks from ridge, hips, and valleys.

Confirm equipment matches plans

Installed equipment (modules, inverter, racking) must match the approved plans. Serial numbers and models should be verifiable.

Test rapid shutdown system

Inspector may test the rapid shutdown system to verify it functions correctly per NEC 690.12.

Verify grounding and bonding

Inspector will verify equipment grounding conductors, grounding electrode conductors, and module/racking bonding.

Missing or incorrect NEC labels

Most common fail reason: labels missing, placed incorrectly, or with wrong content. Double-check all label locations against NEC 690.56 before inspection.

Wiring not secured or exposed

Exposed or improperly secured wiring is a common fail. Ensure all conductors are properly routed, supported, and protected.

Have approved plans on site

A copy of the approved permit plans must be available on site during inspection. Digital copies on a tablet are typically acceptable.

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of San Diego Development Services Department

Last verified: February 15, 2026

6 sources referenced

Official page
Fee schedule
DSD Fee Schedule

Verified February 15, 2026

Portal guide
OpenDSD Permitting Portal

Verified February 15, 2026

Official document
Official page
Permit Process Overview

Verified February 15, 2026

Official page
Inspections Information

Verified February 15, 2026

Frequently Asked Questions

Do I need a solar pv permit in San Diego?
Yes. San Diego requires a solar pv permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does solar pv permit approval take in San Diego?
Processing times in San Diego vary depending on project complexity and current review volume. The process involves 6 steps. Contact San Diego Development Services for current timelines.
What documents are required for a solar pv permit in San Diego?
San Diego requires 13 documents including Permit Application, Electrical Permit Application, Solar PV Checklist, Site Plan, and others. See the full list above for details.
What happens if I build without a solar pv permit in San Diego?
Building without a permit in San Diego can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my solar pv permit submission in San Diego?
Yes. PermitMagic generates a submission-ready packet tailored to San Diego's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a solar pv permit cost in San Diego?
Solar PV permit fees in San Diego typically range from $274 to $894, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with San Diego.

Related Permits

Solar PV permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a solar pv permit packet for San Diego, California — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download