EV Charger Permit Submission Checklist in Denver, Colorado

Everything you need to apply for a ev charger permit in Denver, Colorado — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$150 – $330
Review time
Varies by jurisdiction
Inspections
4 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

EV Charger Permit Checklist

Denver5 required, 0 optional

Forms & Applications(1)

  • EV Charger Electrical Permit ApplicationREQUIRED[1][2]

    Completed Denver CPD electrical permit application for residential Level 2 charging station installation

Plans & Diagrams(2)

  • Installation Plan & DetailsREQUIRED[5][6]

    Site plan showing EVSE location, mounting method, conduit routing, circuit panel location, and GFCI placement

  • Service Panel Certification or Upgrade DocsREQUIRED[9][10]

    Licensed electrician certification of existing panel adequacy or upgrade plan with load calculation if needed

Supporting Documents(2)

  • Electrical Load CalculationREQUIRED[3][4]

    NEC-compliant calculation per Article 625 confirming 40-50 amp circuit feasibility and panel capacity

  • Equipment Nameplate & SpecificationsREQUIRED[7][8]

    Manufacturer specifications, UL certification, and technical data for Level 2 EVSE (SAE J1772 compliant)

This checklist is for reference only. Requirements may change — always verify with Denver before submission.

Generate your permit packet

Get a personalized EV Charger permit packet for Denver, Colorado — tailored to your project details.

  • Required forms: EV Charger Electrical Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $50–$200 estimated total
  • Step-by-step Denver Community Planning and Development portal submission guide
  • Inspection prep checklist (4 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Denver requires the following documents for this permit application.

R

EV Charger Electrical Permit Application

Completed Denver CPD electrical permit application for residential Level 2 charging station installation

R

Electrical Load Calculation

NEC-compliant calculation per Article 625 confirming 40-50 amp circuit feasibility and panel capacity

R

Installation Plan & Details

Site plan showing EVSE location, mounting method, conduit routing, circuit panel location, and GFCI placement

R

Equipment Nameplate & Specifications

Manufacturer specifications, UL certification, and technical data for Level 2 EVSE (SAE J1772 compliant)

R

Service Panel Certification or Upgrade Docs

Licensed electrician certification of existing panel adequacy or upgrade plan with load calculation if needed

Permit Process

Follow these steps to submit your permit application through Denver Community Planning and Development.

  1. 1

    Prepare Application & Documentation

    Gather all documents including load calculations and equipment specs. Ensure compliance with Denver Electrical Code based on NEC.

    You'll need: EV Charger Electrical Permit Application

  2. 2

    Submit Permit Online

    Submit application and all supporting documents through eDenver online permit system

    You'll need: Electrical Load Calculation, Installation Plan & Details, Equipment Nameplate & Specifications, Service Panel Certification or Upgrade Docs

  3. 3

    Plan Review & Approval

    Denver CPD reviews for code compliance, dedicated circuit amperage, GFCI requirements, and mounting specifications

  4. 4

    Pay Permit Fee

    Pay residential electrical permit fee (typically $100-$200 for EV charger work). Permit is valid for 120 days.

  5. 5

    Schedule & Conduct Inspections

    Schedule rough-in inspection (before EVSE installation) and final inspection (after complete installation and connections)

  6. 6

    Final Approval & Permit Closure

    Upon passing final electrical inspection, receive approval and permit closure documentation

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
EV Charger Permit Fee$100 – $200Verified
Plan Review Fee$50 – $130Verified

Inspections Required

40-50 amp dedicated circuit breaker properly installed and l

40-50 amp dedicated circuit breaker properly installed and labeled

GFCI protection correctly installed on outlet or in breaker

GFCI protection correctly installed on outlet or in breaker

Wire gauge adequate for circuit amperage (8 AWG minimum) wit

Wire gauge adequate for circuit amperage (8 AWG minimum) with proper conduit protection

EVSE securely mounted and positioned per manufacturer requir

EVSE securely mounted and positioned per manufacturer requirements with adequate clearances

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Denver Community Planning and Development

Last verified: February 15, 2026

2 sources referenced

Official page
Denver CPD - Electrical Permits

Verified February 15, 2026

Portal guide
eDenver Permit System

Verified February 15, 2026

Official page
Denver Electrical Code Requirements

Verified February 15, 2026

Frequently Asked Questions

Do I need a ev charger permit in Denver?
Yes. Denver requires a ev charger permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does ev charger permit approval take in Denver?
Processing times in Denver vary depending on project complexity and current review volume. The process involves 6 steps. Contact Denver Development Services for current timelines.
What documents are required for a ev charger permit in Denver?
Denver requires 5 documents including EV Charger Electrical Permit Application, Electrical Load Calculation, Installation Plan & Details, Equipment Nameplate & Specifications, and others. See the full list above for details.
What happens if I build without a ev charger permit in Denver?
Building without a permit in Denver can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my ev charger permit submission in Denver?
Yes. PermitMagic generates a submission-ready packet tailored to Denver's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a ev charger permit cost in Denver?
EV Charger permit fees in Denver typically range from $150 to $330, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Denver.

Related Permits

EV Charger permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a ev charger permit packet for Denver, Colorado — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download