EV Charger Permit Fees & Costs in Denver, Colorado
Everything you need to apply for a ev charger permit in Denver, Colorado — documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $150 – $330
- Review time
- Varies by jurisdiction
- Inspections
- 4 inspections required
Limited Data Available
Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Denver directly.
Estimated Total Fees
$150 – $330
Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.
| Fee Component | Range | Confidence |
|---|---|---|
| EV Charger Permit Fee[1][2] Residential EV charger electrical permit. Additional fees apply if main service panel upgrade is required. | $100 – $200 | ✓ |
| Plan Review Fee[3][4] Plan review fee is typically 50-65% of the permit fee. | $50 – $130 | ✓ |
| Estimated Total | $150 – $330 |
Fees shown as ranges. Always verify the exact amount with Denver before submission. Additional fees may apply for expedited review or resubmittals.
Generate your permit packet
Get a personalized EV Charger permit packet for Denver, Colorado — tailored to your project details.
- Required forms: EV Charger Electrical Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $50–$200 estimated total
- Step-by-step Denver Community Planning and Development portal submission guide
- Inspection prep checklist (4 items)
- Personalized for your specific project details
Free to preview · Pro to download
Required Documents
Denver requires the following documents for this permit application.
EV Charger Electrical Permit Application
Completed Denver CPD electrical permit application for residential Level 2 charging station installation
Electrical Load Calculation
NEC-compliant calculation per Article 625 confirming 40-50 amp circuit feasibility and panel capacity
Installation Plan & Details
Site plan showing EVSE location, mounting method, conduit routing, circuit panel location, and GFCI placement
Equipment Nameplate & Specifications
Manufacturer specifications, UL certification, and technical data for Level 2 EVSE (SAE J1772 compliant)
Service Panel Certification or Upgrade Docs
Licensed electrician certification of existing panel adequacy or upgrade plan with load calculation if needed
Permit Process
Follow these steps to submit your permit application through Denver Community Planning and Development.
- 1
Prepare Application & Documentation
Gather all documents including load calculations and equipment specs. Ensure compliance with Denver Electrical Code based on NEC.
You'll need: EV Charger Electrical Permit Application
- 2
Submit Permit Online
Submit application and all supporting documents through eDenver online permit system
You'll need: Electrical Load Calculation, Installation Plan & Details, Equipment Nameplate & Specifications, Service Panel Certification or Upgrade Docs
- 3
Plan Review & Approval
Denver CPD reviews for code compliance, dedicated circuit amperage, GFCI requirements, and mounting specifications
- 4
Pay Permit Fee
Pay residential electrical permit fee (typically $100-$200 for EV charger work). Permit is valid for 120 days.
- 5
Schedule & Conduct Inspections
Schedule rough-in inspection (before EVSE installation) and final inspection (after complete installation and connections)
- 6
Final Approval & Permit Closure
Upon passing final electrical inspection, receive approval and permit closure documentation
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a ev charger permit in Denver?
- Yes. Denver requires a ev charger permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does ev charger permit approval take in Denver?
- Processing times in Denver vary depending on project complexity and current review volume. The process involves 6 steps. Contact Denver Development Services for current timelines.
- What documents are required for a ev charger permit in Denver?
- Denver requires 5 documents including EV Charger Electrical Permit Application, Electrical Load Calculation, Installation Plan & Details, Equipment Nameplate & Specifications, and others. See the full list above for details.
- What happens if I build without a ev charger permit in Denver?
- Building without a permit in Denver can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my ev charger permit submission in Denver?
- Yes. PermitMagic generates a submission-ready packet tailored to Denver's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a ev charger permit cost in Denver?
- EV Charger permit fees in Denver typically range from $150 to $330, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Denver.
Related Permits
Other permits in Denver
Ready to apply? Build your submission packet.
Answer a few project questions and get a ev charger permit packet for Denver, Colorado — with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview · Pro to download