ADU Permit Fees & Costs in Washington, District of Columbia

Everything you need to apply for a adu permit in Washington, District of Columbia — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$3,750 – $15,675
Review time
Varies by jurisdiction
Inspections
8 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Washington directly.

Estimated Total Fees

$3,750$15,675

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
ADU Permit Fee[1][2]

Permit fees calculated based on construction cost: $20-$25 per $1,000 of estimated construction cost for buildings. Historic District Review fees and ANC notification fees may apply. All fees payable to DC Department of Buildings.

$2,500 – $9,500
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$1,250 – $6,175
Estimated Total$3,750$15,675

Fees shown as ranges. Always verify the exact amount with Washington before submission. Additional fees may apply for expedited review or resubmittals.

Generate your permit packet

Get a personalized ADU permit packet for Washington, District of Columbia — tailored to your project details.

  • Required forms: DC Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,250–$9,500 estimated total
  • Step-by-step DC Department of Buildings portal submission guide
  • Inspection prep checklist (8 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Washington requires the following documents for this permit application.

R

DC Building Permit Application

Completed DC Form 200 (Building Permit Application) submitted through DC Department of Buildings online portal

R

Architectural Drawings

Complete architectural drawings prepared and signed by a DC-licensed architect, including floor plans, elevations, sections, and wall sections

R

Site Plan

Site plan showing property lines, building footprint, setbacks, parking, tree canopy, and existing utilities with proposed modifications

R

Energy Code Compliance Certification

Energy Star certification or compliance statement with HVAC sizing calculations and insulation specifications

R

Historic District Compatibility Statement

If property is in historic district, statement showing compatibility with Historic Preservation Review Board guidelines or HPRB approval letter

R

Proof of Service to ANC

Proof that applicant has served notice to Advisory Neighborhood Commission before permit approval

Permit Process

Follow these steps to submit your permit application through DC Department of Buildings.

  1. 1

    Pre-Application Consultation

    Consult with DC Department of Buildings to discuss ADU proposal, zoning compliance, and special overlay requirements

  2. 2

    Historic Preservation Review (if applicable)

    If property is in Historic District, submit application to Historic Preservation Review Board and obtain approval

    You'll need: Historic District Compatibility Statement

  3. 3

    Advisory Neighborhood Commission Notification

    Notify ANC for the ward and provide notice period before permit application

    You'll need: Proof of Service to ANC

  4. 4

    Submit Plans and Building Permit Application

    Submit complete building permit application with architectural drawings, site plan, energy code compliance, and all supporting documents through DC Building Permits online system

    You'll need: DC Building Permit Application, Architectural Drawings, Site Plan, Energy Code Compliance Certification

  5. 5

    Plan Examination Review

    DC Department of Buildings conducts comprehensive review of plans for compliance with zoning, building code, energy code, and ADA requirements

  6. 6

    Address Plan Review Comments

    Submit revised plans and supplemental documents to address examiner comments and corrections

  7. 7

    Fee Payment

    Pay calculated building permit fees and any applicable zoning verification fees

  8. 8

    Building Permit Issuance

    Receive building permit and notice to proceed with construction

  9. 9

    Construction Inspections

    Schedule and pass required inspections: foundation, framing, mechanical, plumbing, electrical, energy code, and final occupancy inspection

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

DC Department of Buildings

Last verified: February 15, 2026

2 sources referenced

Official page
DC Building Code (Based on IBC 2015)

Verified February 15, 2026

Portal guide
Official page

Frequently Asked Questions

Do I need a adu permit in Washington?
Yes. Washington requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Washington?
Processing times in Washington vary depending on project complexity and current review volume. The process involves 9 steps. Contact Washington Development Services for current timelines.
What documents are required for a adu permit in Washington?
Washington requires 6 documents including DC Building Permit Application, Architectural Drawings, Site Plan, Energy Code Compliance Certification, and others. See the full list above for details.
What happens if I build without a adu permit in Washington?
Building without a permit in Washington can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Washington?
Yes. PermitMagic generates a submission-ready packet tailored to Washington's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Washington?
ADU permit fees in Washington typically range from $3,750 to $15,675, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Washington.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Washington, District of Columbia — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download