ADU Permit Submission Checklist in Orlando, Florida

Everything you need to apply for a adu permit in Orlando, Florida — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$3,450 – $11,550
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

ADU Permit Checklist

Orlando6 required, 0 optional

Forms & Applications(1)

  • Building Permit ApplicationREQUIRED[1][2]

    Completed City of Orlando building permit application form with detailed ADU project information and property owner details

Plans & Diagrams(5)

  • Architectural DrawingsREQUIRED[3][4]

    Complete architectural plans signed and sealed by a licensed Florida architect, including floor plans, elevations, and construction details

  • Site PlanREQUIRED[5][6]

    Site plan showing property boundaries, lot dimensions, building footprint, setbacks, parking areas, and utility locations

  • Zoning Verification LetterREQUIRED[7][8]

    Zoning verification letter from City of Orlando Planning confirming ADU is permitted in property zoning district

  • Structural Engineering PlansREQUIRED[9][10]

    Structural engineering plans and calculations by a licensed Florida professional engineer for foundation and structural design

  • Mechanical and Utility PlansREQUIRED[11][12]

    Plans showing water supply, sewer, electrical, and gas connections with separate metering for independent ADU utilities

This checklist is for reference only. Requirements may change — always verify with Orlando before submission.

Generate your permit packet

Get a personalized ADU permit packet for Orlando, Florida — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,150–$7,000 estimated total
  • Step-by-step Orlando Permitting Division portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Orlando requires the following documents for this permit application.

R

Building Permit Application

Completed City of Orlando building permit application form with detailed ADU project information and property owner details

R

Architectural Drawings

Complete architectural plans signed and sealed by a licensed Florida architect, including floor plans, elevations, and construction details

R

Site Plan

Site plan showing property boundaries, lot dimensions, building footprint, setbacks, parking areas, and utility locations

R

Zoning Verification Letter

Zoning verification letter from City of Orlando Planning confirming ADU is permitted in property zoning district

R

Structural Engineering Plans

Structural engineering plans and calculations by a licensed Florida professional engineer for foundation and structural design

R

Mechanical and Utility Plans

Plans showing water supply, sewer, electrical, and gas connections with separate metering for independent ADU utilities

Permit Process

Follow these steps to submit your permit application through Orlando Permitting Division.

  1. 1

    Zoning Eligibility Verification

    Obtain zoning verification letter from City of Orlando Planning confirming ADU eligibility in property zoning district

    You'll need: Zoning Verification Letter

  2. 2

    Submit Building Permit Application

    Submit building permit application with complete architectural, structural, and utility plans to Orlando Permitting Division

    You'll need: Building Permit Application, Architectural Drawings, Site Plan, Structural Engineering Plans, Mechanical and Utility Plans

  3. 3

    Plan Review and Approval

    City of Orlando Permitting Division conducts comprehensive plan review for zoning and building code compliance

  4. 4

    Address Plan Review Comments

    Revise and resubmit plans to address any code compliance issues or comments from plan review

  5. 5

    Permit Issuance and Fee Payment

    Pay all permit and inspection fees and receive approved building permit

  6. 6

    Construction Inspections

    Schedule and pass required inspections throughout construction: foundation, framing, electrical, plumbing, mechanical, and final

  7. 7

    Certificate of Occupancy

    Receive Certificate of Occupancy from Building Official upon successful final inspection and compliance verification

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$2,300 – $7,000Verified
Plan Review Fee$1,150 – $4,550Verified

Inspections Required

Foundation and footing inspection per Florida Building Code

Foundation and footing inspection per Florida Building Code

Framing and structural member verification

Framing and structural member verification

Electrical rough-in and separate service panel inspection

Electrical rough-in and separate service panel inspection

Plumbing rough-in and fixture installation inspection

Plumbing rough-in and fixture installation inspection

Mechanical systems and HVAC installation inspection

Mechanical systems and HVAC installation inspection

Final inspection and Certificate of Occupancy issuance

Final inspection and Certificate of Occupancy issuance

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Orlando Permitting Division

Last verified: February 15, 2026

2 sources referenced

Official page
Orlando Code Chapter 25 (Zoning)

Verified February 15, 2026

Official page
City of Orlando Permitting Division

Verified February 15, 2026

Portal guide
City of Orlando Permits Online Portal

Verified February 15, 2026

Fee schedule

Frequently Asked Questions

Do I need a adu permit in Orlando?
Yes. Orlando requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Orlando?
Processing times in Orlando vary depending on project complexity and current review volume. The process involves 7 steps. Contact Orlando Development Services for current timelines.
What documents are required for a adu permit in Orlando?
Orlando requires 6 documents including Building Permit Application, Architectural Drawings, Site Plan, Zoning Verification Letter, and others. See the full list above for details.
What happens if I build without a adu permit in Orlando?
Building without a permit in Orlando can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Orlando?
Yes. PermitMagic generates a submission-ready packet tailored to Orlando's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Orlando?
ADU permit fees in Orlando typically range from $3,450 to $11,550, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Orlando.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Orlando, Florida — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download