ADU Permit Fees & Costs in Chicago, Illinois

Everything you need to apply for a adu permit in Chicago, Illinois — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$6,750 – $22,275
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Chicago directly.

Estimated Total Fees

$6,750$22,275

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
ADU Permit Fee[1][2]

Chicago passed coach house ordinance allowing ADUs. Permit fees based on valuation per Chicago Building Code. Fees include plan review and inspections.

$4,500 – $13,500
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$2,250 – $8,775
Estimated Total$6,750$22,275

Fees shown as ranges. Always verify the exact amount with Chicago before submission. Additional fees may apply for expedited review or resubmittals.

Avoid rejections — generate a submission-ready packet

Get a personalized ADU permit packet for Chicago, Illinois — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $2,250–$13,500 estimated total
  • Step-by-step Chicago Department of Buildings portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Chicago requires the following documents for this permit application.

R

Building Permit Application

Chicago building permit application submitted through ePermit web system

R

Architectural Plans

Plans and specifications prepared by Illinois licensed architect. Coach house/ADU plans with all required architectural details

R

Site Plan

Site plan showing property lines, setbacks, building footprint, parking, open space, and lot coverage

R

Structural Plans and Calculations

Structural design sealed by Illinois licensed structural engineer

R

Mechanical, Electrical, Plumbing Plans

MEP plans showing water, sewer, electric, gas, HVAC, and separate meter connections

R

Certified Lot Survey

Current certified lot survey showing property boundaries and dimensions

Permit Process

Follow these steps to submit your permit application through Chicago Department of Buildings.

  1. 1

    Pre-Design Consultation

    Consult with DOB about coach house/ADU requirements under Chicago Zoning Ordinance

  2. 2

    ePermit Application Submission

    Submit building permit application and all design documents through Chicago ePermitWeb system

    You'll need: Building Permit Application, Architectural Plans, Site Plan, Structural Plans and Calculations, Mechanical, Electrical, Plumbing Plans, Certified Lot Survey

  3. 3

    Initial Plan Review

    DOB and other departments conduct plan review for compliance with Chicago Building Code and zoning ordinance

  4. 4

    Corrections and Revisions

    Address examiner comments and resubmit revised plans through ePermitWeb

  5. 5

    Permit Approval and Fee Payment

    Final approval and payment of permit and inspection fees

  6. 6

    Construction with Required Inspections

    Conduct construction with DOB inspections at foundation, framing, electrical, plumbing, mechanical, and final stages

  7. 7

    Final Approval and Occupancy

    Final inspection approval and authorization to occupy coach house/ADU

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Chicago Department of Buildings

Last verified: February 15, 2026

2 sources referenced

Official page
Portal guide
Chicago ePermitWeb System

Verified February 15, 2026

Official page

Frequently Asked Questions

Do I need a adu permit in Chicago?
Yes. Chicago requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Chicago?
Processing times in Chicago vary depending on project complexity and current review volume. The process involves 7 steps. Contact Chicago Development Services for current timelines.
What documents are required for a adu permit in Chicago?
Chicago requires 6 documents including Building Permit Application, Architectural Plans, Site Plan, Structural Plans and Calculations, and others. See the full list above for details.
What happens if I build without a adu permit in Chicago?
Building without a permit in Chicago can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Chicago?
Yes. PermitMagic generates a submission-ready packet tailored to Chicago's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Chicago?
ADU permit fees in Chicago typically range from $6,750 to $22,275, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Chicago.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Chicago, Illinois — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download