ADU Permit Fees & Costs in New Orleans, Louisiana

Everything you need to apply for a adu permit in New Orleans, Louisiana — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$3,450 – $9,900
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with New Orleans directly.

Estimated Total Fees

$3,450$9,900

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
ADU Permit Fee[1][2]

Permit fees based on construction valuation per New Orleans fee schedule. Building permit, plan review, and inspection fees included. Impact fees may apply for utilities and infrastructure.

$2,300 – $6,000
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$1,150 – $3,900
Estimated Total$3,450$9,900

Fees shown as ranges. Always verify the exact amount with New Orleans before submission. Additional fees may apply for expedited review or resubmittals.

Avoid rejections — generate a submission-ready packet

Get a personalized ADU permit packet for New Orleans, Louisiana — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,150–$6,000 estimated total
  • Step-by-step City of New Orleans Planning and Development District portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

New Orleans requires the following documents for this permit application.

R

Building Permit Application

Completed City of New Orleans building permit application with complete project description, property owner contact information, and construction cost estimates

R

Architectural Drawings

Complete architectural plans signed by a licensed Louisiana architect, including floor plans, elevations, sections, and construction details with compliance notes

R

Site Plan

Site plan showing property boundaries, dimensions, building footprint, setbacks, parking layout, access routes, and existing utilities

R

Zoning Verification Letter

Zoning verification letter from New Orleans Planning confirming property zoning district and ADU eligibility under current zoning ordinance

R

Structural Engineering Plans

Structural engineering plans and calculations by a licensed Louisiana professional engineer for foundation, framing, and load-bearing elements

R

Mechanical and Utility Plans

Plans showing water supply, sewer, electrical, gas connections and separate metering for water, electric, and gas services to ADU

R

Proof of Property Ownership

Current property deed or title commitment showing applicant ownership of subject property

Permit Process

Follow these steps to submit your permit application through City of New Orleans Planning and Development District.

  1. 1

    Zoning Eligibility Verification

    Obtain zoning verification letter from New Orleans Planning confirming ADU is allowed in property zoning district and meets dimensional requirements

    You'll need: Zoning Verification Letter, Proof of Property Ownership

  2. 2

    Submit Building Permit Application

    Submit complete permit application with architectural, structural, utility plans and all required supporting documentation to New Orleans Planning and Development

    You'll need: Building Permit Application, Architectural Drawings, Site Plan, Structural Engineering Plans, Mechanical and Utility Plans

  3. 3

    Plan Review and Approval

    New Orleans Planning conducts comprehensive plan review for compliance with zoning ordinance, Louisiana Building Code, and design standards

  4. 4

    Address Plan Review Comments

    Revise and resubmit plans as needed to address any code compliance issues or comments raised during plan review

  5. 5

    Permit Issuance and Payment

    Pay all permit fees and receive approved building permit authorizing construction to begin

  6. 6

    Construction Inspections

    Schedule and pass required inspections: foundation, framing, electrical, plumbing, mechanical, and final inspection per Louisiana Building Code

  7. 7

    Certificate of Occupancy

    Receive Certificate of Occupancy from New Orleans Building Official upon successful final inspection and code compliance verification

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of New Orleans Planning and Development District

Last verified: February 15, 2026

2 sources referenced

Official page
New Orleans ADU Development Guidelines

Verified February 15, 2026

Official page
Portal guide
Fee schedule

Frequently Asked Questions

Do I need a adu permit in New Orleans?
Yes. New Orleans requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in New Orleans?
Processing times in New Orleans vary depending on project complexity and current review volume. The process involves 7 steps. Contact New Orleans Development Services for current timelines.
What documents are required for a adu permit in New Orleans?
New Orleans requires 7 documents including Building Permit Application, Architectural Drawings, Site Plan, Zoning Verification Letter, and others. See the full list above for details.
What happens if I build without a adu permit in New Orleans?
Building without a permit in New Orleans can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in New Orleans?
Yes. PermitMagic generates a submission-ready packet tailored to New Orleans's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in New Orleans?
ADU permit fees in New Orleans typically range from $3,450 to $9,900, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with New Orleans.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for New Orleans, Louisiana — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]City of New Orleans Planning and Development DistrictNew Orleans ADU Development Guidelineshttps://www.nola.gov/planning(verified Feb 15, 2026)
  2. [2]City of New Orleans Planning and Development DistrictCity of New Orleans Zoning Ordinance and Codehttps://library.municode.com/la/new_orleans(verified Feb 15, 2026)
  3. [3]City of New Orleans Planning and Development DistrictNew Orleans Permits and Development Services Portalhttps://www.nola.gov/permits(verified Feb 15, 2026)
  4. [4]City of New Orleans Planning and Development DistrictNew Orleans Building Permit and Development Fee Schedulehttps://www.nola.gov/planning(verified Feb 15, 2026)