ADU Permit Requirements in St. Paul, Minnesota
Everything you need to apply for a adu permit in St. Paul, Minnesota โ documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $4,500 โ $15,675
- Review time
- Varies by jurisdiction
- Inspections
- 7 inspections required
Limited Data Available
Some information on this page has not been fully verified. We're working to improve data quality. Always verify with St. Paul directly.
Permit Requirements (6 items)
6 required๐ Forms & Applications(1)
๐ Plans & Diagrams(3)
๐ Supporting Documents(2)
Generate your permit packet
Get a personalized ADU permit packet for St. Paul, Minnesota โ tailored to your project details.
- Required forms: Building Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $1,500โ$9,500 estimated total
- Step-by-step St. Paul Department of Safety and Inspections portal submission guide
- Inspection prep checklist (7 items)
- Personalized for your specific project details
Free to preview ยท Pro to download
Permit Process
Follow these steps to submit your permit application through St. Paul Department of Safety and Inspections.
- 1
Pre-Application Consultation
Consult with St. Paul Department of Safety and Inspections regarding ADU requirements, design guidelines, and procedures
You'll need: Proof of Ownership
- 2
Zoning Verification
Confirm property is in eligible zoning district (residential) and meets lot size and setback requirements for ADU
You'll need: Zoning Certification
- 3
Submit Building Permit Package
Submit complete permit application with architectural plans, site plan, utility coordination, and zoning certification
You'll need: Building Permit Application, Architectural Plans, Site Plan, Utility Plans and Coordination
- 4
Plan Review
Department staff review plans for compliance with St. Paul Zoning Code Section 66.291 and building code requirements
- 5
Submit Plan Revisions
Address plan review comments and resubmit revised plans for final approval
- 6
Pay Permit and Inspection Fees
Pay building permit, plan review, and inspection fees to receive permit authorization
- 7
Construction and Occupancy Inspections
Pass required inspections including foundation, framing, electrical, plumbing, mechanical, and final occupancy
Fees and Timeline
Fee Breakdown
| Fee | Range | Confidence |
|---|---|---|
| ADU Permit Fee | $3,000 โ $9,500 | Verified |
| Plan Review Fee | $1,500 โ $6,175 | Verified |
Inspections Required
Foundation and footing inspection per Minnesota Building Cod
Foundation and footing inspection per Minnesota Building Code
Framing inspection of structural members and connections
Framing inspection of structural members and connections
Electrical inspection of service panel, circuits, and ground
Electrical inspection of service panel, circuits, and grounding
Plumbing inspection of water supply, fixtures, and drainage
Plumbing inspection of water supply, fixtures, and drainage systems
Mechanical/HVAC system inspection and proper installation ve
Mechanical/HVAC system inspection and proper installation verification
Rental unit registration inspection if ADU will be rented
Rental unit registration inspection if ADU will be rented
Final inspection for Code compliance and Certificate of Occu
Final inspection for Code compliance and Certificate of Occupancy
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a adu permit in St. Paul?
- Yes. St. Paul requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does adu permit approval take in St. Paul?
- Processing times in St. Paul vary depending on project complexity and current review volume. The process involves 7 steps. Contact St. Paul Development Services for current timelines.
- What documents are required for a adu permit in St. Paul?
- St. Paul requires 6 documents including Building Permit Application, Architectural Plans, Site Plan, Zoning Certification, and others. See the full list above for details.
- What happens if I build without a adu permit in St. Paul?
- Building without a permit in St. Paul can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my adu permit submission in St. Paul?
- Yes. PermitMagic generates a submission-ready packet tailored to St. Paul's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a adu permit cost in St. Paul?
- ADU permit fees in St. Paul typically range from $4,500 to $15,675, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with St. Paul.
Related Permits
Other permits in St. Paul
Ready to apply? Build your submission packet.
Answer a few project questions and get a adu permit packet for St. Paul, Minnesota โ with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview ยท Pro to download