ADU Permit Fees & Costs in Henderson, Nevada

Everything you need to apply for a adu permit in Henderson, Nevada — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$4,200 – $11,880
Review time
Varies by jurisdiction
Inspections
8 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Henderson directly.

Estimated Total Fees

$4,200$11,880

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
ADU Permit Fee[1][2]

Permit fees based on estimated project valuation per Henderson Master Fee Schedule. Includes building permit, plan review fees, and inspection fees. Separate utility impact fees may apply depending on water/sewer capacity analysis.

$2,800 – $7,200
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$1,400 – $4,680
Estimated Total$4,200$11,880

Fees shown as ranges. Always verify the exact amount with Henderson before submission. Additional fees may apply for expedited review or resubmittals.

Generate your permit packet

Get a personalized ADU permit packet for Henderson, Nevada — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,400–$7,200 estimated total
  • Step-by-step Henderson Community Development Department portal submission guide
  • Inspection prep checklist (8 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Henderson requires the following documents for this permit application.

R

Building Permit Application

Completed Henderson building permit application (Form PF-1) with project description, property details, contractor information, and owner certification

R

Architectural Drawings

Complete architectural drawings prepared by a Nevada-licensed architect or engineer, including floor plans, elevations, sections, and structural details

R

Site Plan

Site plan at 1/8" scale or smaller showing property boundaries, lot dimensions, building footprints, setbacks, parking layout, and utility connections

R

Proof of Ownership

Current deed, title report, or notarized letter from property owner confirming ownership and authorization for ADU construction

R

Utility and Mechanical Plans

Plans showing water, sewer, electrical, and gas connections with separate metering specifications for independent ADU utility service

R

Nevada Building Code Compliance Statement

Statement certifying compliance with current Nevada Revised Statutes Chapter 278C and local Henderson zoning requirements for ADU construction

Permit Process

Follow these steps to submit your permit application through Henderson Community Development Department.

  1. 1

    Verify ADU Eligibility and Zoning

    Confirm property eligibility for ADU under Nevada law and Henderson municipal code. Verify lot size, zoning district compatibility, and parcel-specific restrictions. Contact Henderson Planning Division for zoning verification if needed.

    You'll need: Proof of Ownership, Nevada Building Code Compliance Statement

  2. 2

    Submit Building Permit Application

    Submit complete building permit application with architectural, site, and utility plans to Henderson Community Development Department. Can be submitted online or in person at main office.

    You'll need: Building Permit Application, Architectural Drawings, Site Plan, Utility and Mechanical Plans

  3. 3

    Plan Review and Interdepartmental Routing

    Henderson conducts plan review for building code compliance, fire safety, water/sewer capacity, and utility verification. Routing through fire marshal, public works, and utility departments.

  4. 4

    Address Review Comments and Resubmit

    Revise plans to address any plan review comments from building, fire, or utility departments. Resubmit revised plans for final approval.

  5. 5

    Permit Issuance and Payment

    Pay all required permit, plan review, and inspection fees. Receive building permit authorization to begin construction.

  6. 6

    Construction and Required Inspections

    Schedule and pass all required inspections: foundation, framing, electrical, plumbing, mechanical, and final inspection before occupancy.

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Henderson Community Development Department

Last verified: February 15, 2026

2 sources referenced

Official page
Fee schedule

Frequently Asked Questions

Do I need a adu permit in Henderson?
Yes. Henderson requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Henderson?
Processing times in Henderson vary depending on project complexity and current review volume. The process involves 6 steps. Contact Henderson Development Services for current timelines.
What documents are required for a adu permit in Henderson?
Henderson requires 6 documents including Building Permit Application, Architectural Drawings, Site Plan, Proof of Ownership, and others. See the full list above for details.
What happens if I build without a adu permit in Henderson?
Building without a permit in Henderson can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Henderson?
Yes. PermitMagic generates a submission-ready packet tailored to Henderson's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Henderson?
ADU permit fees in Henderson typically range from $4,200 to $11,880, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Henderson.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Henderson, Nevada — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download