ADU Permit Fees & Costs in Las Vegas, Nevada

Everything you need to apply for a adu permit in Las Vegas, Nevada — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$4,800 – $14,025
Review time
Varies by jurisdiction
Inspections
8 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Las Vegas directly.

Estimated Total Fees

$4,800$14,025

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
ADU Permit Fee[1][2]

Permit fees calculated based on estimated construction valuation per Las Vegas Master Fee Schedule. Includes building permit, plan review, and inspection fees. Utility impact fees may apply based on water/sewer demand analysis. Fire service fees may apply.

$3,200 – $8,500
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$1,600 – $5,525
Estimated Total$4,800$14,025

Fees shown as ranges. Always verify the exact amount with Las Vegas before submission. Additional fees may apply for expedited review or resubmittals.

Avoid rejections — generate a submission-ready packet

Get a personalized ADU permit packet for Las Vegas, Nevada — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,600–$8,500 estimated total
  • Step-by-step Las Vegas Department of Planning portal submission guide
  • Inspection prep checklist (8 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Las Vegas requires the following documents for this permit application.

R

Building Permit Application

Completed City of Las Vegas building permit application with project scope, property address, estimated valuation, contractor information, and owner signature

R

Architectural Drawings

Complete architectural and structural drawings prepared and sealed by Nevada-licensed architect or professional engineer, including floor plans, elevations, cross-sections, and details

R

Site Plan and Property Plat

Site plan showing property lines, existing structures, proposed ADU location, setbacks, parking spaces, utility connections, and drainage patterns

R

Proof of Ownership

Current property deed, title insurance commitment, or notarized letter from owner authorizing ADU construction

R

Utility Connection Plans

Plans showing separate water supply, sewer, electrical service, and gas connections with independent metering locations and utility company approval letters

R

Zoning Verification Letter

Letter from Las Vegas Planning Department confirming parcel zoning designation and ADU eligibility for the specific property location

Permit Process

Follow these steps to submit your permit application through Las Vegas Department of Planning.

  1. 1

    Obtain Zoning Verification and Eligibility Confirmation

    Contact Las Vegas Planning Department to verify property zoning and ADU eligibility. Obtain zoning verification letter confirming property location allows ADU use under Nevada Chapter 278C and local ordinance.

    You'll need: Proof of Ownership, Zoning Verification Letter

  2. 2

    Submit Complete Building Permit Application

    Submit building permit application package including architectural, site, and utility plans to Las Vegas Development Services. Can submit online through development portal or in person.

    You'll need: Building Permit Application, Architectural Drawings, Site Plan and Property Plat, Utility Connection Plans

  3. 3

    Plan Review and Department Coordination

    Las Vegas conducts comprehensive plan review including building code compliance, fire-life safety, parking requirements, utility capacity, and environmental review. Coordination with fire marshal, public works, utilities.

  4. 4

    Address Plan Review Comments

    Revise plans to address any concerns or non-compliances identified in plan review. Resubmit revised plans and calculations for final approval.

  5. 5

    Final Approval and Permit Issuance

    Obtain final plan approval and pay all required permit, plan review, and inspection fees. Receive building permit and authorization to begin ADU construction.

  6. 6

    Construction and Inspections

    Schedule required inspections at foundation, framing, electrical rough-in, plumbing rough-in, mechanical rough-in, and final completion stages. All inspections must pass before occupancy.

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Las Vegas Department of Planning

Last verified: February 15, 2026

2 sources referenced

Portal guide
Official page
Fee schedule
Las Vegas Master Fee Schedule

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Las Vegas?
Yes. Las Vegas requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Las Vegas?
Processing times in Las Vegas vary depending on project complexity and current review volume. The process involves 6 steps. Contact Las Vegas Development Services for current timelines.
What documents are required for a adu permit in Las Vegas?
Las Vegas requires 6 documents including Building Permit Application, Architectural Drawings, Site Plan and Property Plat, Proof of Ownership, and others. See the full list above for details.
What happens if I build without a adu permit in Las Vegas?
Building without a permit in Las Vegas can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Las Vegas?
Yes. PermitMagic generates a submission-ready packet tailored to Las Vegas's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Las Vegas?
ADU permit fees in Las Vegas typically range from $4,800 to $14,025, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Las Vegas.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Las Vegas, Nevada — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download