ADU Permit Online Portal Guide in Portland, Oregon

Everything you need to apply for a adu permit in Portland, Oregon — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$2,250 – $6,930
Review time
Varies by jurisdiction
Inspections
7 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Portland Bureau of Development Services

Verified

7-step online submission process — account registration required[1][2]

Open Portal

Step 1: Pre-Application Meeting

[3][4]

Optional pre-application meeting with BDS staff to discuss ADU proposal and address questions about HB 2001 compliance

What You Need

  • Property Survey or Title

Portal steps may change without notice. Always confirm the current process at Portland's online portal.

Generate your permit packet

Get a personalized ADU permit packet for Portland, Oregon — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $750–$4,200 estimated total
  • Step-by-step Portland Bureau of Development Services portal submission guide
  • Inspection prep checklist (7 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Portland requires the following documents for this permit application.

R

Building Permit Application

Completed BDS Form 1 (Application for Residential Building Permit)

R

Architectural Plans

Complete architectural drawings signed by a licensed architect, including floor plans, elevations, sections, and details

R

Site Plan

Site plan showing lot boundaries, building footprint, setbacks, parking, driveways, and utility locations

R

Energy Compliance Report

Energy Code Compliance form demonstrating compliance with Oregon Energy Code (IECC)

R

Property Survey or Title

Current property survey or proof of lot dimensions (title page of deed with lot size)

R

Utility Connection Plans

Plans showing water, sewer, electrical, and gas connections as applicable

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$1,500 – $4,200Verified
Plan Review Fee$750 – $2,730Verified

Inspections Required

Foundation and footings per IBC standards

Foundation and footings per IBC standards

Framing and structural members verification

Framing and structural members verification

Electrical rough-in and panel inspection

Electrical rough-in and panel inspection

Plumbing rough-in and final connections

Plumbing rough-in and final connections

Mechanical systems and HVAC installation

Mechanical systems and HVAC installation

Final inspection for overall Code compliance

Final inspection for overall Code compliance

Energy Code compliance verification

Energy Code compliance verification

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Portland Bureau of Development Services

Last verified: February 15, 2026

2 sources referenced

Official page
Oregon HB 2001 - Statewide ADU Law

Verified February 15, 2026

Portal guide
Official page
Portland ADU Development Guide

Verified February 15, 2026

Official page
BDS Plan Review Handbook

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Portland?
Yes. Portland requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Portland?
Processing times in Portland vary depending on project complexity and current review volume. The process involves 7 steps. Contact Portland Development Services for current timelines.
What documents are required for a adu permit in Portland?
Portland requires 6 documents including Building Permit Application, Architectural Plans, Site Plan, Energy Compliance Report, and others. See the full list above for details.
What happens if I build without a adu permit in Portland?
Building without a permit in Portland can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Portland?
Yes. PermitMagic generates a submission-ready packet tailored to Portland's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Portland?
ADU permit fees in Portland typically range from $2,250 to $6,930, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Portland.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Portland, Oregon — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]Portland Bureau of Development ServicesOregon HB 2001 - Statewide ADU Lawhttps://olis.oregonlegislature.gov/lro/bills/session/80/HB2001(verified Feb 15, 2026)
  2. [2]Portland Bureau of Development ServicesPortland City Code Title 33.110 (Multi-Dwelling Zones)https://www.portlandmaps.com/bds(verified Feb 15, 2026)
  3. [3]Portland Bureau of Development ServicesPortland ADU Development Guidehttps://www.portland.gov/bds(verified Feb 15, 2026)
  4. [4]Portland Bureau of Development ServicesBDS Plan Review Handbookhttps://www.portland.gov/bds(verified Feb 15, 2026)