ADU Permit Submission Checklist in Philadelphia, Pennsylvania

Everything you need to apply for a adu permit in Philadelphia, Pennsylvania — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$3,000 – $10,725
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

ADU Permit Checklist

Philadelphia7 required, 0 optional

Forms & Applications(1)

  • Building Permit ApplicationREQUIRED[1][2]

    Completed City of Philadelphia building permit application with complete project description, property owner contact information, and estimated construction cost

Plans & Diagrams(5)

  • Architectural DrawingsREQUIRED[3][4]

    Complete architectural plans signed by a licensed Pennsylvania architect, including floor plans, elevations, sections, and construction details with compliance notes

  • Site PlanREQUIRED[5][6]

    Site plan showing property boundaries, dimensions, building footprint, setbacks, parking layout, access routes, and existing utilities

  • Zoning Verification LetterREQUIRED[7][8]

    Zoning verification letter from Philadelphia Planning Department confirming property zoning district and ADU eligibility under current zoning ordinance

  • Structural Engineering PlansREQUIRED[9][10]

    Structural engineering plans and calculations by a licensed Pennsylvania professional engineer for foundation, framing, and load-bearing elements

  • Mechanical and Utility PlansREQUIRED[11][12]

    Plans showing water supply, sewer, electrical, gas connections and separate metering for water, electric, and gas services to ADU

Supporting Documents(1)

  • Proof of Property OwnershipREQUIRED[13][14]

    Current property deed or title commitment showing applicant ownership of subject property

This checklist is for reference only. Requirements may change — always verify with Philadelphia before submission.

Avoid rejections — generate a submission-ready packet

Get a personalized ADU permit packet for Philadelphia, Pennsylvania — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,000–$6,500 estimated total
  • Step-by-step City of Philadelphia Department of Licenses and Inspections portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Philadelphia requires the following documents for this permit application.

R

Building Permit Application

Completed City of Philadelphia building permit application with complete project description, property owner contact information, and estimated construction cost

R

Architectural Drawings

Complete architectural plans signed by a licensed Pennsylvania architect, including floor plans, elevations, sections, and construction details with compliance notes

R

Site Plan

Site plan showing property boundaries, dimensions, building footprint, setbacks, parking layout, access routes, and existing utilities

R

Zoning Verification Letter

Zoning verification letter from Philadelphia Planning Department confirming property zoning district and ADU eligibility under current zoning ordinance

R

Structural Engineering Plans

Structural engineering plans and calculations by a licensed Pennsylvania professional engineer for foundation, framing, and load-bearing elements

R

Mechanical and Utility Plans

Plans showing water supply, sewer, electrical, gas connections and separate metering for water, electric, and gas services to ADU

R

Proof of Property Ownership

Current property deed or title commitment showing applicant ownership of subject property

Permit Process

Follow these steps to submit your permit application through City of Philadelphia Department of Licenses and Inspections.

  1. 1

    Zoning Eligibility Verification

    Obtain zoning verification letter from Philadelphia Planning Department confirming ADU is allowed in property zoning district and meets dimensional requirements

    You'll need: Zoning Verification Letter, Proof of Property Ownership

  2. 2

    Submit Building Permit Application

    Submit complete permit application with architectural, structural, utility plans and all required supporting documentation to Philadelphia Licenses and Inspections

    You'll need: Building Permit Application, Architectural Drawings, Site Plan, Structural Engineering Plans, Mechanical and Utility Plans

  3. 3

    Plan Review and Approval

    Philadelphia Licenses and Inspections conducts comprehensive plan review for compliance with zoning ordinance, Pennsylvania Building Code, and design standards

  4. 4

    Address Plan Review Comments

    Revise and resubmit plans as needed to address any code compliance issues or comments raised during plan review

  5. 5

    Permit Issuance and Payment

    Pay all permit fees and receive approved building permit authorizing construction to begin

  6. 6

    Construction Inspections

    Schedule and pass required inspections: foundation, framing, electrical, plumbing, mechanical, and final inspection per Pennsylvania Building Code

  7. 7

    Certificate of Occupancy

    Receive Certificate of Occupancy from Philadelphia Building Official upon successful final inspection and code compliance verification

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$2,000 – $6,500Verified
Plan Review Fee$1,000 – $4,225Verified

Inspections Required

Foundation and footing inspection per Pennsylvania Building

Foundation and footing inspection per Pennsylvania Building Code

Framing and structural member verification

Framing and structural member verification

Electrical rough-in and separate service panel inspection

Electrical rough-in and separate service panel inspection

Plumbing rough-in and fixture installation inspection

Plumbing rough-in and fixture installation inspection

Mechanical systems and HVAC installation inspection

Mechanical systems and HVAC installation inspection

Final inspection and Certificate of Occupancy

Final inspection and Certificate of Occupancy

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Philadelphia Department of Licenses and Inspections

Last verified: February 15, 2026

2 sources referenced

Official page
Philadelphia ADU Development Guidelines

Verified February 15, 2026

Official page
City of Philadelphia Zoning Code

Verified February 15, 2026

Portal guide
Fee schedule

Frequently Asked Questions

Do I need a adu permit in Philadelphia?
Yes. Philadelphia requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Philadelphia?
Processing times in Philadelphia vary depending on project complexity and current review volume. The process involves 7 steps. Contact Philadelphia Development Services for current timelines.
What documents are required for a adu permit in Philadelphia?
Philadelphia requires 7 documents including Building Permit Application, Architectural Drawings, Site Plan, Zoning Verification Letter, and others. See the full list above for details.
What happens if I build without a adu permit in Philadelphia?
Building without a permit in Philadelphia can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Philadelphia?
Yes. PermitMagic generates a submission-ready packet tailored to Philadelphia's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Philadelphia?
ADU permit fees in Philadelphia typically range from $3,000 to $10,725, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Philadelphia.

Related Permits

ADU permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Philadelphia, Pennsylvania — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]City of Philadelphia Department of Licenses and InspectionsPhiladelphia ADU Development Guidelineshttps://www.phila.gov/li(verified Feb 15, 2026)
  2. [2]City of Philadelphia Department of Licenses and InspectionsCity of Philadelphia Zoning Codehttps://library.municode.com/pa/philadelphia(verified Feb 15, 2026)
  3. [3]City of Philadelphia Department of Licenses and InspectionsPhiladelphia Permits and Licenses Portalhttps://www.phila.gov/permits(verified Feb 15, 2026)
  4. [4]City of Philadelphia Department of Licenses and InspectionsPhiladelphia Building Permit and Development Fee Schedulehttps://www.phila.gov/li(verified Feb 15, 2026)