EV Charger Permit Fees & Costs in Philadelphia, Pennsylvania

Everything you need to apply for a ev charger permit in Philadelphia, Pennsylvania — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$270 – $512
Review time
Varies by jurisdiction
Inspections
4 inspections required
VerifiedLast verified: Feb 15, 20261 verified source

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Philadelphia directly.

Estimated Total Fees

$270$512

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
EV Charger Permit Fee[1][2]

Residential EV charger electrical permit fees based on work scope. May increase if main service upgrade required.

$180 – $310
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$90 – $202
Estimated Total$270$512

Fees shown as ranges. Always verify the exact amount with Philadelphia before submission. Additional fees may apply for expedited review or resubmittals.

Avoid rejections — generate a submission-ready packet

Get a personalized EV Charger permit packet for Philadelphia, Pennsylvania — tailored to your project details.

  • Required forms: EV Charger Electrical Permit Application, Licensed Electrician Information, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $90–$310 estimated total
  • Step-by-step Philadelphia Department of Licenses and Inspections portal submission guide
  • Inspection prep checklist (4 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Philadelphia requires the following documents for this permit application.

R

EV Charger Electrical Permit Application

Completed electrical permit application for residential Level 2 EV charger (240V, 40-50 amp)

R

Electrical Load Calculation

NEC Article 625 compliant load calculation and electrical design documentation

R

Site Plan & Installation Diagram

Detailed installation diagram showing EVSE location, circuit path, mounting details, and safety clearances

R

Equipment Specifications & Listing

Manufacturer specifications, UL listing, and technical manual for Level 2 EVSE device

R

Licensed Electrician Information

Licensed electrician information and statement of NEC and Pennsylvania electrical code compliance

Permit Process

Follow these steps to submit your permit application through Philadelphia Department of Licenses and Inspections.

  1. 1

    Engage Licensed Electrician

    Hire Pennsylvania-licensed electrician to design and plan EV charger installation per NEC Article 625

    You'll need: Licensed Electrician Information

  2. 2

    Prepare & Submit Documentation

    Prepare load calculation, site plan, and equipment specifications. Submit through Philadelphia online portal.

    You'll need: EV Charger Electrical Permit Application, Electrical Load Calculation, Site Plan & Installation Diagram, Equipment Specifications & Listing

  3. 3

    Plan Review

    Philadelphia L&I reviews for NEC compliance, dedicated circuit sizing, GFCI protection, and code standards

  4. 4

    Pay Permit Fee & Receive Permit

    Pay electrical permit fee (typically $180-$310 for residential EV chargers). Permit valid for 180 days.

  5. 5

    Schedule Inspections

    Schedule rough-in inspection (before EVSE installation) and final inspection (after all connections complete)

  6. 6

    Inspection & Final Approval

    Pass electrical rough-in and final inspections. Receive inspection approval and permit sign-off.

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Philadelphia Department of Licenses and Inspections

Last verified: February 15, 2026

1 source referenced

Official page
Portal guide
Philadelphia Permits Portal

Verified February 15, 2026

Official page
Fee schedule
Electrical Permit Fee Schedule

Verified February 15, 2026

Frequently Asked Questions

Do I need a ev charger permit in Philadelphia?
Yes. Philadelphia requires a ev charger permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does ev charger permit approval take in Philadelphia?
Processing times in Philadelphia vary depending on project complexity and current review volume. The process involves 6 steps. Contact Philadelphia Development Services for current timelines.
What documents are required for a ev charger permit in Philadelphia?
Philadelphia requires 5 documents including EV Charger Electrical Permit Application, Electrical Load Calculation, Site Plan & Installation Diagram, Equipment Specifications & Listing, and others. See the full list above for details.
What happens if I build without a ev charger permit in Philadelphia?
Building without a permit in Philadelphia can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my ev charger permit submission in Philadelphia?
Yes. PermitMagic generates a submission-ready packet tailored to Philadelphia's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a ev charger permit cost in Philadelphia?
EV Charger permit fees in Philadelphia typically range from $270 to $512, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Philadelphia.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a ev charger permit packet for Philadelphia, Pennsylvania — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]Philadelphia Department of Licenses and InspectionsPhiladelphia Department of Licenses and Inspectionshttps://www.phila.gov/li(verified Feb 15, 2026)
  2. [2]Philadelphia Department of Licenses and InspectionsPhiladelphia Permits Portalhttps://www.phila.gov/li(verified Feb 15, 2026)
  3. [3]Philadelphia Department of Licenses and InspectionsPhiladelphia Building Code - Electrical Requirementshttps://www.phila.gov/li(verified Feb 15, 2026)
  4. [4]Philadelphia Department of Licenses and InspectionsElectrical Permit Fee Schedulehttps://www.phila.gov/li(verified Feb 15, 2026)