EV Charger Permit Submission Checklist in Memphis, Tennessee

Everything you need to apply for a ev charger permit in Memphis, Tennessee — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$195 – $380
Review time
Varies by jurisdiction
Inspections
4 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

EV Charger Permit Checklist

Memphis5 required, 0 optional

Forms & Applications(2)

  • EV Charger Electrical Permit ApplicationREQUIRED[1][2]

    Completed electrical permit application for residential Level 2 EV charger (240V, 40-50 amp)

  • Licensed Electrician InformationREQUIRED[9][10]

    Licensed electrician information and statement of NEC and Tennessee electrical code compliance

Plans & Diagrams(1)

  • Site Plan & Installation DiagramREQUIRED[5][6]

    Detailed installation diagram showing EVSE location, circuit path, mounting details, and safety clearances

Supporting Documents(2)

  • Electrical Load CalculationREQUIRED[3][4]

    NEC Article 625 compliant load calculation and electrical design documentation

  • Equipment Specifications & ListingREQUIRED[7][8]

    Manufacturer specifications, UL listing, and technical manual for Level 2 EVSE device

This checklist is for reference only. Requirements may change — always verify with Memphis before submission.

Generate your permit packet

Get a personalized EV Charger permit packet for Memphis, Tennessee — tailored to your project details.

  • Required forms: EV Charger Electrical Permit Application, Licensed Electrician Information, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $65–$230 estimated total
  • Step-by-step Memphis Department of Development and Planning portal submission guide
  • Inspection prep checklist (4 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Memphis requires the following documents for this permit application.

R

EV Charger Electrical Permit Application

Completed electrical permit application for residential Level 2 EV charger (240V, 40-50 amp)

R

Electrical Load Calculation

NEC Article 625 compliant load calculation and electrical design documentation

R

Site Plan & Installation Diagram

Detailed installation diagram showing EVSE location, circuit path, mounting details, and safety clearances

R

Equipment Specifications & Listing

Manufacturer specifications, UL listing, and technical manual for Level 2 EVSE device

R

Licensed Electrician Information

Licensed electrician information and statement of NEC and Tennessee electrical code compliance

Permit Process

Follow these steps to submit your permit application through Memphis Department of Development and Planning.

  1. 1

    Engage Licensed Electrician

    Hire Tennessee-licensed electrician to design and plan EV charger installation per NEC Article 625

    You'll need: Licensed Electrician Information

  2. 2

    Prepare & Submit Documentation

    Prepare load calculation, site plan, and equipment specifications. Submit through Memphis online portal.

    You'll need: EV Charger Electrical Permit Application, Electrical Load Calculation, Site Plan & Installation Diagram, Equipment Specifications & Listing

  3. 3

    Plan Review

    Memphis Development and Planning reviews for NEC compliance, dedicated circuit sizing, GFCI protection, and code standards

  4. 4

    Pay Permit Fee & Receive Permit

    Pay electrical permit fee (typically $130-$230 for residential EV chargers). Permit valid for 180 days.

  5. 5

    Schedule Inspections

    Schedule rough-in inspection (before EVSE installation) and final inspection (after all connections complete)

  6. 6

    Inspection & Final Approval

    Pass electrical rough-in and final inspections. Receive inspection approval and permit sign-off.

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
EV Charger Permit Fee$130 – $230Verified
Plan Review Fee$65 – $150Verified

Inspections Required

Dedicated 40-50 amp circuit breaker properly labeled and ins

Dedicated 40-50 amp circuit breaker properly labeled and installed

GFCI protection installed and tested operational

GFCI protection installed and tested operational

Proper wire gauge (8 AWG minimum for 50 amp circuit) install

Proper wire gauge (8 AWG minimum for 50 amp circuit) installed in protective conduit

EVSE mounted securely with proper height, clearance, and wea

EVSE mounted securely with proper height, clearance, and weatherproofing

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Memphis Department of Development and Planning

Last verified: February 15, 2026

2 sources referenced

Official page
Portal guide
Memphis Permits Portal

Verified February 15, 2026

Official page
Fee schedule
Electrical Permit Fee Schedule

Verified February 15, 2026

Frequently Asked Questions

Do I need a ev charger permit in Memphis?
Yes. Memphis requires a ev charger permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does ev charger permit approval take in Memphis?
Processing times in Memphis vary depending on project complexity and current review volume. The process involves 6 steps. Contact Memphis Development Services for current timelines.
What documents are required for a ev charger permit in Memphis?
Memphis requires 5 documents including EV Charger Electrical Permit Application, Electrical Load Calculation, Site Plan & Installation Diagram, Equipment Specifications & Listing, and others. See the full list above for details.
What happens if I build without a ev charger permit in Memphis?
Building without a permit in Memphis can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my ev charger permit submission in Memphis?
Yes. PermitMagic generates a submission-ready packet tailored to Memphis's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a ev charger permit cost in Memphis?
EV Charger permit fees in Memphis typically range from $195 to $380, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Memphis.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a ev charger permit packet for Memphis, Tennessee — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]Memphis Department of Development and PlanningMemphis Department of Development and Planninghttps://www.memphistn.gov/permits(verified Feb 15, 2026)
  2. [2]Memphis Department of Development and PlanningMemphis Permits Portalhttps://memphistn.gov/permits(verified Feb 15, 2026)
  3. [3]Memphis Department of Development and PlanningMemphis Building Code - Electrical Requirementshttps://www.memphistn.gov/permits(verified Feb 15, 2026)
  4. [4]Memphis Department of Development and PlanningElectrical Permit Fee Schedulehttps://www.memphistn.gov/permits(verified Feb 15, 2026)