ADU Permit Submission Checklist in El Paso, Texas

Everything you need to apply for a adu permit in El Paso, Texas — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$3,300 – $9,900
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

ADU Permit Checklist

El Paso7 required, 0 optional

Forms & Applications(1)

  • Building Permit ApplicationREQUIRED[1][2]

    Completed City of El Paso building permit application with complete project description, property owner contact information, and construction cost estimates

Plans & Diagrams(5)

  • Architectural DrawingsREQUIRED[3][4]

    Complete architectural plans signed by a licensed Texas architect, including floor plans, elevations, sections, and construction details with compliance notes

  • Site PlanREQUIRED[5][6]

    Site plan showing property boundaries, dimensions, building footprint, setbacks, parking layout, access routes, and existing utilities

  • Zoning Verification LetterREQUIRED[7][8]

    Zoning verification letter from El Paso Planning confirming property zoning district and ADU eligibility under current zoning ordinance

  • Structural Engineering PlansREQUIRED[9][10]

    Structural engineering plans and calculations by a licensed Texas professional engineer for foundation, framing, and load-bearing elements

  • Mechanical and Utility PlansREQUIRED[11][12]

    Plans showing water supply, sewer, electrical, gas connections and separate metering for water, electric, and gas services to ADU

Supporting Documents(1)

  • Proof of Property OwnershipREQUIRED[13][14]

    Current property deed or title commitment showing applicant ownership of subject property

This checklist is for reference only. Requirements may change — always verify with El Paso before submission.

Generate your permit packet

Get a personalized ADU permit packet for El Paso, Texas — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,100–$6,000 estimated total
  • Step-by-step City of El Paso Planning and Building Department portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

El Paso requires the following documents for this permit application.

R

Building Permit Application

Completed City of El Paso building permit application with complete project description, property owner contact information, and construction cost estimates

R

Architectural Drawings

Complete architectural plans signed by a licensed Texas architect, including floor plans, elevations, sections, and construction details with compliance notes

R

Site Plan

Site plan showing property boundaries, dimensions, building footprint, setbacks, parking layout, access routes, and existing utilities

R

Zoning Verification Letter

Zoning verification letter from El Paso Planning confirming property zoning district and ADU eligibility under current zoning ordinance

R

Structural Engineering Plans

Structural engineering plans and calculations by a licensed Texas professional engineer for foundation, framing, and load-bearing elements

R

Mechanical and Utility Plans

Plans showing water supply, sewer, electrical, gas connections and separate metering for water, electric, and gas services to ADU

R

Proof of Property Ownership

Current property deed or title commitment showing applicant ownership of subject property

Permit Process

Follow these steps to submit your permit application through City of El Paso Planning and Building Department.

  1. 1

    Zoning Eligibility Verification

    Obtain zoning verification letter from El Paso Planning confirming ADU is allowed in property zoning district and meets dimensional requirements

    You'll need: Zoning Verification Letter, Proof of Property Ownership

  2. 2

    Submit Building Permit Application

    Submit complete permit application with architectural, structural, utility plans and all required supporting documentation to El Paso Planning and Building

    You'll need: Building Permit Application, Architectural Drawings, Site Plan, Structural Engineering Plans, Mechanical and Utility Plans

  3. 3

    Plan Review and Approval

    El Paso Planning conducts comprehensive plan review for compliance with zoning ordinance, Texas Building Code, and design standards

  4. 4

    Address Plan Review Comments

    Revise and resubmit plans as needed to address any code compliance issues or comments raised during plan review

  5. 5

    Permit Issuance and Payment

    Pay all permit fees and receive approved building permit authorizing construction to begin

  6. 6

    Construction Inspections

    Schedule and pass required inspections: foundation, framing, electrical, plumbing, mechanical, and final inspection per Texas Building Code

  7. 7

    Certificate of Occupancy

    Receive Certificate of Occupancy from El Paso Building Official upon successful final inspection and code compliance verification

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$2,200 – $6,000Verified
Plan Review Fee$1,100 – $3,900Verified

Inspections Required

Foundation and footing inspection per Texas Building Code

Foundation and footing inspection per Texas Building Code

Framing and structural member verification

Framing and structural member verification

Electrical rough-in and separate service panel inspection

Electrical rough-in and separate service panel inspection

Plumbing rough-in and fixture installation inspection

Plumbing rough-in and fixture installation inspection

Mechanical systems and HVAC installation inspection

Mechanical systems and HVAC installation inspection

Final inspection and Certificate of Occupancy

Final inspection and Certificate of Occupancy

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of El Paso Planning and Building Department

Last verified: February 15, 2026

2 sources referenced

Official page
El Paso ADU Development Guidelines

Verified February 15, 2026

Official page
Portal guide
Fee schedule

Frequently Asked Questions

Do I need a adu permit in El Paso?
Yes. El Paso requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in El Paso?
Processing times in El Paso vary depending on project complexity and current review volume. The process involves 7 steps. Contact El Paso Development Services for current timelines.
What documents are required for a adu permit in El Paso?
El Paso requires 7 documents including Building Permit Application, Architectural Drawings, Site Plan, Zoning Verification Letter, and others. See the full list above for details.
What happens if I build without a adu permit in El Paso?
Building without a permit in El Paso can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in El Paso?
Yes. PermitMagic generates a submission-ready packet tailored to El Paso's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in El Paso?
ADU permit fees in El Paso typically range from $3,300 to $9,900, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with El Paso.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for El Paso, Texas — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]City of El Paso Planning and Building DepartmentEl Paso ADU Development Guidelineshttps://www.elpasotexas.gov/planning(verified Feb 15, 2026)
  2. [2]City of El Paso Planning and Building DepartmentCity of El Paso Zoning Ordinance and Codehttps://library.municode.com/tx/el_paso(verified Feb 15, 2026)
  3. [3]City of El Paso Planning and Building DepartmentEl Paso Permits and Building Services Portalhttps://www.elpasotexas.gov/permits(verified Feb 15, 2026)
  4. [4]City of El Paso Planning and Building DepartmentEl Paso Building Permit and Development Fee Schedulehttps://www.elpasotexas.gov/planning(verified Feb 15, 2026)