ADU Permit Inspection Checklist in Fort Worth, Texas

Everything you need to apply for a adu permit in Fort Worth, Texas — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$3,450 – $11,220
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Inspection Checklist (6 items)

Inspection requirements may vary by project. Always confirm specific inspection criteria with your inspector or local AHJ.

Avoid rejections — generate a submission-ready packet

Get a personalized ADU permit packet for Fort Worth, Texas — tailored to your project details.

  • Required forms: Building Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $1,150–$6,800 estimated total
  • Step-by-step City of Fort Worth Planning and Development Services portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Fort Worth requires the following documents for this permit application.

R

Building Permit Application

Completed City of Fort Worth building permit application with complete project description, property owner contact information, and construction cost estimates

R

Architectural Drawings

Complete architectural plans signed by a licensed Texas architect, including floor plans, elevations, sections, and construction details with compliance notes

R

Site Plan

Site plan showing property boundaries, dimensions, building footprint, setbacks, parking layout, access routes, and existing utilities

R

Zoning Verification Letter

Zoning verification letter from Fort Worth Planning confirming property zoning district and ADU eligibility under current zoning ordinance

R

Structural Engineering Plans

Structural engineering plans and calculations by a licensed Texas professional engineer for foundation, framing, and load-bearing elements

R

Mechanical and Utility Plans

Plans showing water supply, sewer, electrical, gas connections and separate metering for water, electric, and gas services to ADU

R

Proof of Property Ownership

Current property deed or title commitment showing applicant ownership of subject property

Permit Process

Follow these steps to submit your permit application through City of Fort Worth Planning and Development Services.

  1. 1

    Zoning Eligibility Verification

    Obtain zoning verification letter from Fort Worth Planning confirming ADU is allowed in property zoning district and meets dimensional requirements

    You'll need: Zoning Verification Letter, Proof of Property Ownership

  2. 2

    Submit Building Permit Application

    Submit complete permit application with architectural, structural, utility plans and all required supporting documentation to Fort Worth Planning and Development

    You'll need: Building Permit Application, Architectural Drawings, Site Plan, Structural Engineering Plans, Mechanical and Utility Plans

  3. 3

    Plan Review and Approval

    Fort Worth Planning conducts comprehensive plan review for compliance with zoning ordinance, Texas Building Code, and design standards

  4. 4

    Address Plan Review Comments

    Revise and resubmit plans as needed to address any code compliance issues or comments raised during plan review

  5. 5

    Permit Issuance and Payment

    Pay all permit fees and receive approved building permit authorizing construction to begin

  6. 6

    Construction Inspections

    Schedule and pass required inspections: foundation, framing, electrical, plumbing, mechanical, and final inspection per Texas Building Code

  7. 7

    Certificate of Occupancy

    Receive Certificate of Occupancy from Fort Worth Building Official upon successful final inspection and code compliance verification

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$2,300 – $6,800Verified
Plan Review Fee$1,150 – $4,420Verified

Inspections Required

Foundation and footing inspection per Texas Building Code

Foundation and footing inspection per Texas Building Code

Framing and structural member verification

Framing and structural member verification

Electrical rough-in and separate service panel inspection

Electrical rough-in and separate service panel inspection

Plumbing rough-in and fixture installation inspection

Plumbing rough-in and fixture installation inspection

Mechanical systems and HVAC installation inspection

Mechanical systems and HVAC installation inspection

Final inspection and Certificate of Occupancy

Final inspection and Certificate of Occupancy

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Fort Worth Planning and Development Services

Last verified: February 15, 2026

2 sources referenced

Official page
Fort Worth ADU Development Guidelines

Verified February 15, 2026

Official page
Portal guide
Fee schedule

Frequently Asked Questions

Do I need a adu permit in Fort Worth?
Yes. Fort Worth requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Fort Worth?
Processing times in Fort Worth vary depending on project complexity and current review volume. The process involves 7 steps. Contact Fort Worth Development Services for current timelines.
What documents are required for a adu permit in Fort Worth?
Fort Worth requires 7 documents including Building Permit Application, Architectural Drawings, Site Plan, Zoning Verification Letter, and others. See the full list above for details.
What happens if I build without a adu permit in Fort Worth?
Building without a permit in Fort Worth can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Fort Worth?
Yes. PermitMagic generates a submission-ready packet tailored to Fort Worth's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Fort Worth?
ADU permit fees in Fort Worth typically range from $3,450 to $11,220, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Fort Worth.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Fort Worth, Texas — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]City of Fort Worth Planning and Development ServicesFort Worth ADU Development Guidelineshttps://www.fortworthtexas.gov/planning(verified Feb 15, 2026)
  2. [2]City of Fort Worth Planning and Development ServicesCity of Fort Worth Zoning Ordinance and Codehttps://library.municode.com/tx/fort_worth(verified Feb 15, 2026)
  3. [3]City of Fort Worth Planning and Development ServicesFort Worth Permits and Development Services Portalhttps://www.fortworthtexas.gov/permits(verified Feb 15, 2026)
  4. [4]City of Fort Worth Planning and Development ServicesFort Worth Building Permit and Development Fee Schedulehttps://www.fortworthtexas.gov/planning(verified Feb 15, 2026)