Solar PV Permit Fees & Costs in Irving, Texas
Everything you need to apply for a solar pv permit in Irving, Texas — documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $225 – $660
- Review time
- Varies by jurisdiction
- Inspections
- 4 inspections required
Limited Data Available
Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Irving directly.
Estimated Total Fees
$225 – $660
Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.
| Fee Component | Range | Confidence |
|---|---|---|
| Solar PV Permit Fee[1][2] Tiered fee structure: residential systems $150 base plus $0.20 per watt | $150 – $400 | ✓ |
| Plan Review Fee[3][4] Plan review fee is typically 50-65% of the permit fee. | $75 – $260 | ✓ |
| Estimated Total | $225 – $660 |
Fees shown as ranges. Always verify the exact amount with Irving before submission. Additional fees may apply for expedited review or resubmittals.
Avoid rejections — generate a submission-ready packet
Get a personalized Solar PV permit packet for Irving, Texas — tailored to your project details.
- Complete list of required forms and documents
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $75–$400 estimated total
- Step-by-step Building Inspections Division portal submission guide
- Inspection prep checklist (4 items)
- Personalized for your specific project details
Free to preview · Pro to download
Required Documents
Irving requires the following documents for this permit application.
Solar System Design Plan
Complete design plan prepared by licensed professional with electrical and structural details
Calculation and Analysis Documentation
Electrical calculations, load analysis, and grounding study for the system
Component Specifications
Technical data sheets for inverter, combiner boxes, modules, and other equipment
Structural Engineering Report
Licensed structural engineer report certifying roof and mounting system adequacy
Property Owner Consent Document
Written consent from property owner authorizing solar system installation
Utility Coordination Letter
Letter of coordination with utility company regarding interconnection plans
Permit Process
Follow these steps to submit your permit application through Building Inspections Division.
- 1
Prepare Online Application
Prepare and submit solar permit application through City of Irving online portal
You'll need: Solar System Design Plan, Component Specifications, Property Owner Consent Document
- 2
Upload Supporting Analysis
Upload structural report, calculations, and utility coordination documentation
You'll need: Calculation and Analysis Documentation, Structural Engineering Report, Utility Coordination Letter
- 3
Building Plan Examination
Building Services examines structural design and roof mounting system
You'll need: Solar System Design Plan, Structural Engineering Report
- 4
Electrical Design Review
Electrical inspector reviews design for NEC compliance and utility interface
You'll need: Solar System Design Plan, Calculation and Analysis Documentation
- 5
Issue Construction Permit
Issuance of electrical and building construction permit
- 6
Conduct Inspections
Schedule and perform rough electrical and final electrical inspections
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a solar pv permit in Irving?
- Yes. Irving requires a solar pv permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does solar pv permit approval take in Irving?
- Processing times in Irving vary depending on project complexity and current review volume. The process involves 6 steps. Contact Irving Development Services for current timelines.
- What documents are required for a solar pv permit in Irving?
- Irving requires 6 documents including Solar System Design Plan, Calculation and Analysis Documentation, Component Specifications, Structural Engineering Report, and others. See the full list above for details.
- What happens if I build without a solar pv permit in Irving?
- Building without a permit in Irving can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my solar pv permit submission in Irving?
- Yes. PermitMagic generates a submission-ready packet tailored to Irving's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a solar pv permit cost in Irving?
- Solar PV permit fees in Irving typically range from $225 to $660, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Irving.
Related Permits
Other permits in Irving
Ready to apply? Build your submission packet.
Answer a few project questions and get a solar pv permit packet for Irving, Texas — with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview · Pro to download