ADU Permit Fees & Costs in Seattle, Washington

Everything you need to apply for a adu permit in Seattle, Washington — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$7,500 – $24,750
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Seattle directly.

Estimated Total Fees

$7,500$24,750

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
ADU Permit Fee[1][2]

Master Use Permit and building permit fees based on valuation. Seattle progressive DADU (Detached ADU) policies allow relaxed parking requirements in many zones.

$5,000 – $15,000
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$2,500 – $9,750
Estimated Total$7,500$24,750

Fees shown as ranges. Always verify the exact amount with Seattle before submission. Additional fees may apply for expedited review or resubmittals.

Generate your permit packet

Get a personalized ADU permit packet for Seattle, Washington — tailored to your project details.

  • Required forms: Master Application and Permit, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $2,500–$15,000 estimated total
  • Step-by-step Seattle SDCI portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Seattle requires the following documents for this permit application.

R

Master Application and Permit

Completed Seattle Master Application (Master Use Permit) for ADU/DADU projects

R

Architectural Plans

Architectural drawings prepared by Washington licensed architect including floor plans, elevations, sections, and building details

R

Site Plan

Site plan showing lot boundaries, setbacks, building location, parking, open space, and access ways

R

Structural Plans and Calculations

Structural design sealed by Washington licensed structural engineer

R

Utility System Plans

Utility connection plans for water, sewer, electric, gas, and separate metering details

R

Geotechnical Report (if required)

Geotechnical investigation report if site conditions warrant or foundation type requires

Permit Process

Follow these steps to submit your permit application through Seattle SDCI.

  1. 1

    Pre-Design Review

    Attend neighborhood consultation meeting and verify zoning compatibility for ADU/DADU

  2. 2

    Master Use Permit Application

    Submit Master Use Permit application with all architectural, structural, and utility plans

    You'll need: Master Application and Permit, Architectural Plans, Site Plan, Structural Plans and Calculations, Utility System Plans

  3. 3

    Master Use Permit Review

    SDCI reviews application for compliance with Seattle Municipal Code and Land Use Code

  4. 4

    Address Comments and Revisions

    Submit revised plans addressing reviewer comments and conditions

  5. 5

    Building Permit Issuance

    Transition to building permit phase and pay permit fees

  6. 6

    Construction with Inspections

    Perform construction with required inspections at key phases

  7. 7

    Final Certificate of Occupancy

    Receive final inspection approval and occupancy certificate

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Seattle SDCI

Last verified: February 15, 2026

2 sources referenced

Official page
Portal guide
Seattle SDCI Permit Portal

Verified February 15, 2026

Official page
SDCI ADU and DADU Design Guide

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Seattle?
Yes. Seattle requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Seattle?
Processing times in Seattle vary depending on project complexity and current review volume. The process involves 7 steps. Contact Seattle Development Services for current timelines.
What documents are required for a adu permit in Seattle?
Seattle requires 6 documents including Master Application and Permit, Architectural Plans, Site Plan, Structural Plans and Calculations, and others. See the full list above for details.
What happens if I build without a adu permit in Seattle?
Building without a permit in Seattle can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Seattle?
Yes. PermitMagic generates a submission-ready packet tailored to Seattle's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Seattle?
ADU permit fees in Seattle typically range from $7,500 to $24,750, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Seattle.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Seattle, Washington — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]Seattle SDCISeattle Municipal Code Title 23 (Land Use Code)https://www.seattle.gov/sdci(verified Feb 15, 2026)
  2. [2]Seattle SDCISeattle SDCI Permit Portalhttps://cosaccela.seattle.gov/portal/(verified Feb 15, 2026)
  3. [3]Seattle SDCISDCI ADU and DADU Design Guidehttps://www.seattle.gov/sdci(verified Feb 15, 2026)