ADU Permit Requirements in Spokane, Washington

Everything you need to apply for a adu permit in Spokane, Washington โ€” documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$1,800 โ€“ $4,125
Review time
Varies by jurisdiction
Inspections
5 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Permit Requirements (7 items)

7 required

๐Ÿ“ Plans & Diagrams(4)

๐Ÿ“„ Supporting Documents(3)

Generate your permit packet

Get a personalized ADU permit packet for Spokane, Washington โ€” tailored to your project details.

  • Complete list of required forms and documents
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $600โ€“$2,500 estimated total
  • Step-by-step City of Spokane portal submission guide
  • Inspection prep checklist (5 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview ยท Pro to download

Permit Process

Follow these steps to submit your permit application through City of Spokane.

  1. 1

    Pre-Application Meeting

    Schedule meeting with Planning staff to discuss ADU proposal, zoning compliance, and preliminary requirements

  2. 2

    Application Submission

    Submit complete building permit application with all required documents and fees

    You'll need: Site Plan, Floor Plans, Elevation Drawings, Proof of Ownership, Environmental Assessment

  3. 3

    Technical Review

    Planning staff reviews for zoning compliance, code violations, and technical requirements

    You'll need: Utility Plans, Structural Calculations

  4. 4

    Permits Issued

    After approval, building permits are issued and ready for construction

  5. 5

    Construction Inspections

    Inspectors verify compliance at foundation, framing, electrical, plumbing, and final stages

  6. 6

    Certificate of Occupancy

    Final inspection approval and certificate of occupancy issued

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
ADU Permit Fee$1,200 โ€“ $2,500Verified
Plan Review Fee$600 โ€“ $1,625Verified

Inspections Required

Foundation inspection per Washington Building Code - verify

Foundation inspection per Washington Building Code - verify proper foundation per plans

Framing inspection - check structural framing and height com

Framing inspection - check structural framing and height compliance (maximum 24 feet)

Electrical inspection - verify separate electrical service a

Electrical inspection - verify separate electrical service and safety compliance

Plumbing inspection - check water and sewer connections for

Plumbing inspection - check water and sewer connections for proper installation

Final inspection - comprehensive verification of all systems

Final inspection - comprehensive verification of all systems and code compliance

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Spokane

Last verified: February 15, 2026

2 sources referenced

Official page
Official page
Official page
ADU Development Guide for Spokane

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Spokane?
Yes. Spokane requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Spokane?
Processing times in Spokane vary depending on project complexity and current review volume. The process involves 6 steps. Contact Spokane Development Services for current timelines.
What documents are required for a adu permit in Spokane?
Spokane requires 7 documents including Site Plan, Floor Plans, Elevation Drawings, Utility Plans, and others. See the full list above for details.
What happens if I build without a adu permit in Spokane?
Building without a permit in Spokane can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Spokane?
Yes. PermitMagic generates a submission-ready packet tailored to Spokane's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Spokane?
ADU permit fees in Spokane typically range from $1,800 to $4,125, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Spokane.

Related Permits

ADU permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Spokane, Washington โ€” with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview ยท Pro to download