ADU Permit Fees & Costs in Tacoma, Washington

Everything you need to apply for a adu permit in Tacoma, Washington — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$2,250 – $4,950
Review time
Varies by jurisdiction
Inspections
6 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Tacoma directly.

Estimated Total Fees

$2,250$4,950

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
ADU Permit Fee[1][2]

Building permit fees based on valuation (approximately 0.5-0.75% of construction value). Planning review fees approximately $500-1000. Utility connection fees and school impact fees apply.

$1,500 – $3,000
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$750 – $1,950
Estimated Total$2,250$4,950

Fees shown as ranges. Always verify the exact amount with Tacoma before submission. Additional fees may apply for expedited review or resubmittals.

Generate your permit packet

Get a personalized ADU permit packet for Tacoma, Washington — tailored to your project details.

  • Complete list of required forms and documents
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $750–$3,000 estimated total
  • Step-by-step City of Tacoma portal submission guide
  • Inspection prep checklist (6 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Tacoma requires the following documents for this permit application.

R

Site Plan

Scaled site plan (minimum 1/4 inch scale) showing property lines, existing and proposed structures, parking, setbacks, and utilities

R

Architectural Plans

Complete architectural drawings including floor plans, sections, and details at 1/4 inch scale minimum

R

Building Elevations

All exterior elevations (north, south, east, west) showing heights, materials, and fenestration patterns

R

Mechanical Plans

HVAC, heating, and cooling system plans with calculations

R

Electrical Plans

Electrical service layout with panel location, circuits, and separate service details for ADU

R

Plumbing Plans

Water supply and sanitary drainage plans showing connections to main structures and utilities

R

Property Title or Deed

Current recorded title or deed showing ownership and any restrictions

R

SEPA Environmental Checklist

Washington State Environmental Policy Act (SEPA) checklist form

Permit Process

Follow these steps to submit your permit application through City of Tacoma.

  1. 1

    Pre-Application Consultation

    Discuss project with Planning staff to identify zoning compliance, code requirements, and application needs

  2. 2

    Application Intake & Completeness Review

    Submit application with all required documents; staff verifies completeness

    You'll need: Site Plan, Architectural Plans, Building Elevations, Property Title or Deed, SEPA Environmental Checklist

  3. 3

    Development Review Process

    Interdepartmental review including Planning, Building, Fire, Utilities, and Environmental Health

    You'll need: Mechanical Plans, Electrical Plans, Plumbing Plans

  4. 4

    Permits Approved & Issued

    Building permits and any conditional use permits approved and ready for construction

  5. 5

    Construction & Inspections

    Builder conducts construction with scheduled inspections at key milestones

  6. 6

    Final Inspection & Certificate of Occupancy

    Final comprehensive inspection and issuance of Certificate of Occupancy

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Tacoma

Last verified: February 15, 2026

2 sources referenced

Official page
Official page

Frequently Asked Questions

Do I need a adu permit in Tacoma?
Yes. Tacoma requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Tacoma?
Processing times in Tacoma vary depending on project complexity and current review volume. The process involves 6 steps. Contact Tacoma Development Services for current timelines.
What documents are required for a adu permit in Tacoma?
Tacoma requires 8 documents including Site Plan, Architectural Plans, Building Elevations, Mechanical Plans, and others. See the full list above for details.
What happens if I build without a adu permit in Tacoma?
Building without a permit in Tacoma can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Tacoma?
Yes. PermitMagic generates a submission-ready packet tailored to Tacoma's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Tacoma?
ADU permit fees in Tacoma typically range from $2,250 to $4,950, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Tacoma.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Tacoma, Washington — with every document, form, and fee organized for submission.