Solar PV Permit Online Portal Guide in Long Beach, California

Everything you need to apply for a solar pv permit in Long Beach, California — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$275 – $870
Review time
Varies — contact authority
Inspections
8 inspections required
Verify before submissionLast verified: Feb 15, 20265 verified sources

LB ePermit

Verified

6-step online submission process — account registration required[1][2]

Open Portal

Step 1: Create Account

[3]

Register for an account on the LB ePermit portal.

What You Need

  • Email address
  • Phone number

Common Mistakes

  • Using a personal email instead of a business email

Portal steps may change without notice. Always confirm the current process at Long Beach's online portal.

Avoid rejections — generate a submission-ready packet

Get a personalized Solar PV permit packet for Long Beach, California — tailored to your project details.

  • Required forms: Permit Application, Electrical Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet, Site Plan Template
  • Fee breakdown: $5–$500 estimated total
  • Step-by-step LB ePermit portal submission guide
  • Inspection prep checklist (8 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Long Beach requires the following documents for this permit application.

R

Permit Application

Standard permit application form for solar PV installation.

R

Electrical Permit Application

Electrical permit application required for all solar PV system installations.

R

Solar PV Checklist

Checklist form for solar PV permit submissions.

R

Site Plan

Scaled drawing showing property layout, building footprint, and proposed solar array placement.

R

Roof Layout / Module Plan

Detailed plan showing individual module placement, dimensions, and spacing on the roof surface.

R

Single-Line Electrical Diagram

Electrical diagram showing PV system components, conductors, disconnects, and utility interconnection.

R

Structural Attachment Detail

Cross-section drawing showing how solar racking attaches to the roof structure.

R

Module Specification Sheet

Manufacturer specification sheet for the solar modules being installed.

R

Inverter Specification Sheet

Manufacturer specification sheet for the inverter(s) being installed.

R

Racking Specification Sheet

Manufacturer specification and engineering letter for the racking/mounting system.

R

Load Calculation Worksheet

Calculation showing existing electrical load and capacity for the solar system addition.

R

NEC Labeling Plan

Plan showing locations and content of all required NEC warning labels and placards.

R

Existing Electrical Panel Photo

Photograph of the existing main electrical panel showing available breaker spaces and labeling.

Optional / Conditional

O

Three-Line Electrical Diagram

Detailed electrical diagram showing all conductors, grounding, and protection devices.

O

Structural Engineering Letter

Letter from a licensed structural engineer confirming the roof can support the proposed system.

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Building Permit Fee$150 – $500Verified
Plan Check Fee$100 – $325Verified
Technology Fee$20 – $20Verified
Strong Motion Instrumentation Fee$5 – $25Verified

Fees are estimates and may change. Verify current fees with Long Beach.

Inspections Required

Verify all NEC labels installed

All NEC-required labels and placards must be installed at main panel, disconnects, inverter, and conduit runs.

Verify fire access pathways

Confirm solar array meets fire department access pathway requirements per California Fire Code.

Confirm equipment matches plans

Installed equipment must match the approved plans. Serial numbers and models should be verifiable.

Test rapid shutdown system

Inspector may test the rapid shutdown system per NEC 690.12.

Verify grounding and bonding

Inspector will verify equipment grounding conductors, grounding electrode conductors, and module/racking bonding.

Missing or incorrect NEC labels

Most common fail reason. Double-check all label locations against NEC 690.56 before inspection.

Wiring not secured or exposed

Exposed or improperly secured wiring is a common fail. Ensure all conductors are properly routed and supported.

Have approved plans on site

A copy of approved permit plans must be available on site during inspection.

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Long Beach Development Services

Last verified: February 15, 2026

5 sources referenced

Official page
Long Beach Solar PV Permit Information

Verified February 15, 2026

Fee schedule
Long Beach Fee Schedule

Verified February 15, 2026

Portal guide
Long Beach Online Permitting Portal

Verified February 15, 2026

Official page
Long Beach Solar PV Guidelines

Verified February 15, 2026

Official page
Long Beach Permit Process

Verified February 15, 2026

Official page
Long Beach Inspections

Verified February 15, 2026

Frequently Asked Questions

Do I need a solar pv permit in Long Beach?
Yes. Long Beach requires a solar pv permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does solar pv permit approval take in Long Beach?
Processing times in Long Beach vary depending on project complexity and current review volume. The process involves 6 steps. Contact Long Beach Development Services for current timelines.
What documents are required for a solar pv permit in Long Beach?
Long Beach requires 13 documents including Permit Application, Electrical Permit Application, Solar PV Checklist, Site Plan, and others. See the full list above for details.
What happens if I build without a solar pv permit in Long Beach?
Building without a permit in Long Beach can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my solar pv permit submission in Long Beach?
Yes. PermitMagic generates a submission-ready packet tailored to Long Beach's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a solar pv permit cost in Long Beach?
Solar PV permit fees in Long Beach typically range from $275 to $870, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Long Beach.

Related Permits

Solar PV permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a solar pv permit packet for Long Beach, California — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download