Deck Permit Fees & Costs in Aurora, Colorado
Everything you need to apply for a deck permit in Aurora, Colorado — documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $375 – $825
- Review time
- Varies by jurisdiction
- Inspections
- 10 inspections required
Limited Data Available
Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Aurora directly.
Estimated Total Fees
$375 – $825
Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.
| Fee Component | Range | Confidence |
|---|---|---|
| Residential Deck Permit Fee[1][2] Fees based on deck square footage. Typically $2-4 per square foot. Large decks may require structural engineer review with additional fees. | $250 – $500 | ✓ |
| Plan Review Fee[3][4] Plan review fee is typically 50-65% of the permit fee. | $125 – $325 | ✓ |
| Estimated Total | $375 – $825 |
Fees shown as ranges. Always verify the exact amount with Aurora before submission. Additional fees may apply for expedited review or resubmittals.
Generate your permit packet
Get a personalized Deck permit packet for Aurora, Colorado — tailored to your project details.
- Complete list of required forms and documents
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $125–$500 estimated total
- Step-by-step City of Aurora Building Division portal submission guide
- Inspection prep checklist (10 items)
- Personalized for your specific project details
Free to preview · Pro to download
Required Documents
Aurora requires the following documents for this permit application.
Deck Construction Plans
Detailed construction plans showing deck layout, dimensions, materials, and structural details. Must include footing depth of 36 inches below grade and frost line considerations.
Footing and Frost Line Documentation
Engineering calculations and diagrams confirming footing depth meets Aurora's 36-inch frost line requirement for structural integrity.
Property Survey or Plot Plan
Current property survey showing deck location, setbacks from property lines, and relationship to existing structures.
Guard Rail and Railing Details
Specifications for guard rails and railings meeting IRC 36-inch height requirements and proper construction standards.
Site Plan with Utilities
Site plan showing location of underground utilities and marking any overhead obstructions to ensure safe installation.
Structural Calculations
Professional structural engineer's calculations for load-bearing capacity and snow load considerations for Colorado.
Permit Process
Follow these steps to submit your permit application through City of Aurora Building Division.
- 1
Pre-Application Consultation
Meet with City of Aurora Building Division staff to discuss deck project requirements, frost line considerations, and preliminary design.
- 2
Prepare and Assemble Documents
Gather and prepare all required documentation including construction plans, footing specifications, and property survey.
You'll need: Deck Construction Plans, Footing and Frost Line Documentation, Property Survey or Plot Plan, Guard Rail and Railing Details, Site Plan with Utilities
- 3
Submit Permit Application
Submit completed permit application with all required documents to the Aurora Development Center in person or via portal.
You'll need: Deck Construction Plans, Footing and Frost Line Documentation, Property Survey or Plot Plan, Guard Rail and Railing Details, Site Plan with Utilities, Structural Calculations
- 4
Technical Review and Compliance Check
City building officials review plans for compliance with local codes, frost line requirements, and structural standards.
You'll need: Structural Calculations
- 5
Permit Issuance
Upon approval, permit is issued and construction may begin. Contractor must post permit on job site.
- 6
Footing and Foundation Inspection
Inspector verifies footings are properly dug to 36 inches and set below frost line with proper materials and drainage.
- 7
Framing and Guard Rail Inspection
Inspector checks structural framing, guard rail installation at proper 36-inch height, and connection details.
- 8
Final Inspection and Certificate of Completion
Final walkthrough to verify deck meets all code requirements. Certificate of Completion issued upon passing.
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a deck permit in Aurora?
- Yes. Aurora requires a deck permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does deck permit approval take in Aurora?
- Processing times in Aurora vary depending on project complexity and current review volume. The process involves 8 steps. Contact Aurora Development Services for current timelines.
- What documents are required for a deck permit in Aurora?
- Aurora requires 6 documents including Deck Construction Plans, Footing and Frost Line Documentation, Property Survey or Plot Plan, Guard Rail and Railing Details, and others. See the full list above for details.
- What happens if I build without a deck permit in Aurora?
- Building without a permit in Aurora can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my deck permit submission in Aurora?
- Yes. PermitMagic generates a submission-ready packet tailored to Aurora's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a deck permit cost in Aurora?
- Deck permit fees in Aurora typically range from $375 to $825, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Aurora.
Related Permits
Other permits in Aurora
Ready to apply? Build your submission packet.
Answer a few project questions and get a deck permit packet for Aurora, Colorado — with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview · Pro to download