ADU Permit Requirements in Colorado Springs, Colorado
Everything you need to apply for a adu permit in Colorado Springs, Colorado โ documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $3,300 โ $11,220
- Review time
- Varies by jurisdiction
- Inspections
- 6 inspections required
Permit Requirements (6 items)
6 required๐ Forms & Applications(1)
๐ Plans & Diagrams(5)
Generate your permit packet
Get a personalized ADU permit packet for Colorado Springs, Colorado โ tailored to your project details.
- Required forms: Building Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $1,100โ$6,800 estimated total
- Step-by-step Colorado Springs Planning and Community Development portal submission guide
- Inspection prep checklist (6 items)
- Personalized for your specific project details
Free to preview ยท Pro to download
Permit Process
Follow these steps to submit your permit application through Colorado Springs Planning and Community Development.
- 1
Zoning Eligibility Verification
Obtain zoning verification letter from Colorado Springs Planning confirming property zoning allows ADU and meets all zone requirements
You'll need: Zoning Verification Letter
- 2
Submit Building Permit Application
Submit complete building permit application with all architectural, structural, and utility plans to Colorado Springs Planning and Development
You'll need: Building Permit Application, Architectural Drawings, Site Plan, Structural Engineering Plans, Mechanical and Utility Plans
- 3
Plan Review and Approval
Colorado Springs Planning and Building Departments conduct comprehensive review for zoning and building code compliance
- 4
Address Plan Review Comments
Revise and resubmit plans to address any code compliance issues, dimensional requirements, or comments from plan review
- 5
Permit Issuance and Fee Payment
Pay all permit and inspection fees and receive authorization to begin construction
- 6
Construction Inspections
Schedule and pass required inspections throughout construction: foundation, framing, electrical, plumbing, mechanical, and final per Colorado Building Code
- 7
Certificate of Occupancy
Receive Certificate of Occupancy from Building Official upon successful final inspection and compliance verification
Fees and Timeline
Fee Breakdown
| Fee | Range | Confidence |
|---|---|---|
| ADU Permit Fee | $2,200 โ $6,800 | Verified |
| Plan Review Fee | $1,100 โ $4,420 | Verified |
Inspections Required
Foundation and footing inspection per Colorado Building Code
Foundation and footing inspection per Colorado Building Code requirements
Framing and structural member inspection for load-bearing el
Framing and structural member inspection for load-bearing elements
Electrical rough-in and separate service panel inspection
Electrical rough-in and separate service panel inspection
Plumbing rough-in and fixture installation inspection
Plumbing rough-in and fixture installation inspection
Mechanical systems and HVAC installation inspection
Mechanical systems and HVAC installation inspection
Final inspection and Certificate of Occupancy issuance
Final inspection and Certificate of Occupancy issuance
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
Colorado Springs Planning and Community Development
Last verified: February 15, 2026
2 sources referenced
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a adu permit in Colorado Springs?
- Yes. Colorado Springs requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does adu permit approval take in Colorado Springs?
- Processing times in Colorado Springs vary depending on project complexity and current review volume. The process involves 7 steps. Contact Colorado Springs Development Services for current timelines.
- What documents are required for a adu permit in Colorado Springs?
- Colorado Springs requires 6 documents including Building Permit Application, Architectural Drawings, Site Plan, Zoning Verification Letter, and others. See the full list above for details.
- What happens if I build without a adu permit in Colorado Springs?
- Building without a permit in Colorado Springs can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my adu permit submission in Colorado Springs?
- Yes. PermitMagic generates a submission-ready packet tailored to Colorado Springs's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a adu permit cost in Colorado Springs?
- ADU permit fees in Colorado Springs typically range from $3,300 to $11,220, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Colorado Springs.
Related Permits
Other permits in Colorado Springs
Ready to apply? Build your submission packet.
Answer a few project questions and get a adu permit packet for Colorado Springs, Colorado โ with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview ยท Pro to download