ADU Permit Online Portal Guide in Denver, Colorado
Everything you need to apply for a adu permit in Denver, Colorado — documents, fees, steps, and a downloadable submission packet.
Key Facts
- Permit required
- Yes
- Submission method
- Online
- Typical fee range
- $6,750 – $23,100
- Review time
- Varies by jurisdiction
- Inspections
- 6 inspections required
Denver Community Planning and Development
Verified7-step online submission process — account registration required[1][2]
Open PortalPortal steps may change without notice. Always confirm the current process at Denver's online portal.
Avoid rejections — generate a submission-ready packet
Get a personalized ADU permit packet for Denver, Colorado — tailored to your project details.
- Required forms: Building Permit Application, and more
- Pre-filled templates: Permit Cover Sheet
- Fee breakdown: $2,250–$14,000 estimated total
- Step-by-step Denver Community Planning and Development portal submission guide
- Inspection prep checklist (6 items)
- Personalized for your specific project details
Free to preview · Pro to download
Required Documents
Denver requires the following documents for this permit application.
Building Permit Application
Completed Denver building permit application submitted through ePermit system
Architectural Plans
Complete set of architectural drawings stamped by Colorado licensed architect, including all required details per Denver Design Guide
Site Plan
Site plan showing lot lines, setbacks, building footprint, parking, usable open space, and landscaping
Structural Calculations
Structural design and calculations sealed by Colorado licensed structural engineer
Utility Plans
Utility connection plans showing water, sewer, electric, and gas connections with separate metering information
Solar Ready Waiver (if applicable)
Solar ready waiver if solar installation not feasible on new ADU
Fees and Timeline
Fee Breakdown
| Fee | Range | Confidence |
|---|---|---|
| ADU Permit Fee | $4,500 – $14,000 | Verified |
| Plan Review Fee | $2,250 – $9,100 | Verified |
Inspections Required
Foundation inspection per IBC standards
Foundation inspection per IBC standards
Framing inspection and structural verification
Framing inspection and structural verification
Electrical rough-in and panel inspection
Electrical rough-in and panel inspection
Plumbing rough-in and fixture inspection
Plumbing rough-in and fixture inspection
Mechanical and HVAC system inspection
Mechanical and HVAC system inspection
Final inspection and Certificate of Occupancy
Final inspection and Certificate of Occupancy
Authority Sources
Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.
Verified February 15, 2026
Verified February 15, 2026
Verified February 15, 2026
Frequently Asked Questions
- Do I need a adu permit in Denver?
- Yes. Denver requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
- How long does adu permit approval take in Denver?
- Processing times in Denver vary depending on project complexity and current review volume. The process involves 7 steps. Contact Denver Development Services for current timelines.
- What documents are required for a adu permit in Denver?
- Denver requires 6 documents including Building Permit Application, Architectural Plans, Site Plan, Structural Calculations, and others. See the full list above for details.
- What happens if I build without a adu permit in Denver?
- Building without a permit in Denver can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
- Can PermitMagic help prepare my adu permit submission in Denver?
- Yes. PermitMagic generates a submission-ready packet tailored to Denver's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
- How much does a adu permit cost in Denver?
- ADU permit fees in Denver typically range from $6,750 to $23,100, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Denver.
Related Permits
Other permits in Denver
ADU permits in nearby cities
Ready to apply? Build your submission packet.
Answer a few project questions and get a adu permit packet for Denver, Colorado — with every document, form, and fee organized for submission.
Build My Permit PacketFree to preview · Pro to download