Solar PV Permit Inspection Checklist in Denver, Colorado

Everything you need to apply for a solar pv permit in Denver, Colorado — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$300 – $990
Review time
Varies by jurisdiction
Inspections
4 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Inspection Checklist (4 items)

Inspection requirements may vary by project. Always confirm specific inspection criteria with your inspector or local AHJ.

Avoid rejections — generate a submission-ready packet

Get a personalized Solar PV permit packet for Denver, Colorado — tailored to your project details.

  • Required forms: Solar PV Permit Application, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $100–$600 estimated total
  • Step-by-step City and County of Denver Community Planning and Development portal submission guide
  • Inspection prep checklist (4 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Denver requires the following documents for this permit application.

R

Solar PV Permit Application

Completed solar photovoltaic permit application (Form PV-1)

R

Site Plan

Site plan showing property boundaries, panel layout, roof orientation, and setback dimensions

R

Electrical One-Line Diagram

Single-line diagram showing PV array, inverter, disconnect switch, meter, and service panel connections

R

Equipment Specification Sheets

Manufacturer datasheets for solar panels, inverters, and mounting hardware with specifications

R

Roof Certification or Structural Assessment

PE-signed certification of roof structural adequacy or structural assessment for loads

R

Electrical Contractor License

Copy of licensed electrician or electrical contractor license for the project

Permit Process

Follow these steps to submit your permit application through City and County of Denver Community Planning and Development.

  1. 1

    Register on Denver eBuild Portal

    Create an account on the City and County of Denver eBuild permitting portal and initiate a new solar PV permit application

    You'll need: Solar PV Permit Application

  2. 2

    Upload Site Plan & Electrical Diagram

    Upload your site plan and electrical one-line diagram showing system configuration

    You'll need: Site Plan, Electrical One-Line Diagram

  3. 3

    Submit Equipment, Roof & Contractor Details

    Upload equipment spec sheets, roof structural certification, and electrical contractor license

    You'll need: Equipment Specification Sheets, Roof Certification or Structural Assessment, Electrical Contractor License

  4. 4

    Pay Fees & Submit for Review

    Pay the permit application fee and formally submit the application for plan review

  5. 5

    Address Plan Review Comments

    Respond to any reviewer comments, corrections, or requests for additional information

  6. 6

    Schedule & Pass Inspections

    Schedule electrical and roof inspections through the portal after system installation

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Solar PV Permit Fee$200 – $600Verified
Plan Review Fee$100 – $390Verified

Inspections Required

Verify panels match approved specifications and roof orienta

Verify panels match approved specifications and roof orientation

Inspect electrical connections, grounding, and disconnect pl

Inspect electrical connections, grounding, and disconnect placement

Confirm roof structure adequacy and proper flashing

Confirm roof structure adequacy and proper flashing

Check rapid shutdown compliance and inverter placement

Check rapid shutdown compliance and inverter placement

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City and County of Denver Community Planning and Development

Last verified: February 15, 2026

2 sources referenced

Official page
Denver Solar PV Permit Requirements

Verified February 15, 2026

Portal guide
Denver eBuild Permitting Portal

Verified February 15, 2026

Fee schedule
Denver Building Division Fee Schedule

Verified February 15, 2026

Official page

Frequently Asked Questions

Do I need a solar pv permit in Denver?
Yes. Denver requires a solar pv permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does solar pv permit approval take in Denver?
Processing times in Denver vary depending on project complexity and current review volume. The process involves 6 steps. Contact Denver Development Services for current timelines.
What documents are required for a solar pv permit in Denver?
Denver requires 6 documents including Solar PV Permit Application, Site Plan, Electrical One-Line Diagram, Equipment Specification Sheets, and others. See the full list above for details.
What happens if I build without a solar pv permit in Denver?
Building without a permit in Denver can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my solar pv permit submission in Denver?
Yes. PermitMagic generates a submission-ready packet tailored to Denver's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a solar pv permit cost in Denver?
Solar PV permit fees in Denver typically range from $300 to $990, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Denver.

Related Permits

Solar PV permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a solar pv permit packet for Denver, Colorado — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download