ADU Permit Fees & Costs in Spokane, Washington

Everything you need to apply for a adu permit in Spokane, Washington — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$1,800 – $4,125
Review time
Varies by jurisdiction
Inspections
5 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Spokane directly.

Estimated Total Fees

$1,800$4,125

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
ADU Permit Fee[1][2]

Planning permit fee approximately $800-1200, Building permit fee $400-1300 based on valuation. Impact fees may apply for schools and capital improvements.

$1,200 – $2,500
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$600 – $1,625
Estimated Total$1,800$4,125

Fees shown as ranges. Always verify the exact amount with Spokane before submission. Additional fees may apply for expedited review or resubmittals.

Generate your permit packet

Get a personalized ADU permit packet for Spokane, Washington — tailored to your project details.

  • Complete list of required forms and documents
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $600–$2,500 estimated total
  • Step-by-step City of Spokane portal submission guide
  • Inspection prep checklist (5 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Spokane requires the following documents for this permit application.

R

Site Plan

Scaled site plan showing property boundaries, existing structures, proposed ADU location, setbacks, and parking

R

Floor Plans

Architectural floor plans showing all rooms, dimensions, and layout of ADU

R

Elevation Drawings

Front, rear, and side elevations showing building height, materials, and fenestration

R

Utility Plans

Plans showing water, sewer, electrical, and gas connections to ADU

R

Proof of Ownership

Current property deed or title showing proof of ownership

R

Environmental Assessment

SEPA environmental checklist if required by jurisdiction

R

Structural Calculations

PE-stamped structural calculations for foundation and framing

Permit Process

Follow these steps to submit your permit application through City of Spokane.

  1. 1

    Pre-Application Meeting

    Schedule meeting with Planning staff to discuss ADU proposal, zoning compliance, and preliminary requirements

  2. 2

    Application Submission

    Submit complete building permit application with all required documents and fees

    You'll need: Site Plan, Floor Plans, Elevation Drawings, Proof of Ownership, Environmental Assessment

  3. 3

    Technical Review

    Planning staff reviews for zoning compliance, code violations, and technical requirements

    You'll need: Utility Plans, Structural Calculations

  4. 4

    Permits Issued

    After approval, building permits are issued and ready for construction

  5. 5

    Construction Inspections

    Inspectors verify compliance at foundation, framing, electrical, plumbing, and final stages

  6. 6

    Certificate of Occupancy

    Final inspection approval and certificate of occupancy issued

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Spokane

Last verified: February 15, 2026

2 sources referenced

Official page
Official page
Official page
ADU Development Guide for Spokane

Verified February 15, 2026

Frequently Asked Questions

Do I need a adu permit in Spokane?
Yes. Spokane requires a adu permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does adu permit approval take in Spokane?
Processing times in Spokane vary depending on project complexity and current review volume. The process involves 6 steps. Contact Spokane Development Services for current timelines.
What documents are required for a adu permit in Spokane?
Spokane requires 7 documents including Site Plan, Floor Plans, Elevation Drawings, Utility Plans, and others. See the full list above for details.
What happens if I build without a adu permit in Spokane?
Building without a permit in Spokane can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my adu permit submission in Spokane?
Yes. PermitMagic generates a submission-ready packet tailored to Spokane's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a adu permit cost in Spokane?
ADU permit fees in Spokane typically range from $1,800 to $4,125, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Spokane.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a adu permit packet for Spokane, Washington — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download