Deck Permit Requirements in Spokane, Washington

Everything you need to apply for a deck permit in Spokane, Washington โ€” documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$225 โ€“ $578
Review time
Varies by jurisdiction
Inspections
8 inspections required
VerifiedLast verified: Feb 15, 20261 verified source

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Spokane directly.

Permit Requirements (6 items)

6 required

๐Ÿ“‹ Forms & Applications(1)

๐Ÿ“ Plans & Diagrams(3)

๐Ÿ“„ Supporting Documents(2)

Generate your permit packet

Get a personalized Deck permit packet for Spokane, Washington โ€” tailored to your project details.

  • Required forms: Contractor Information and Insurance, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $75โ€“$350 estimated total
  • Step-by-step City of Spokane Building Department portal submission guide
  • Inspection prep checklist (8 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview ยท Pro to download

Permit Process

Follow these steps to submit your permit application through City of Spokane Building Department.

  1. 1

    Submit Permit Application

    Submit completed permit application with construction plans and site survey to City of Spokane Building Department

    You'll need: Construction Plans per WA State Building Code, Property Survey and Site Plan

  2. 2

    Ownership and Contractor Verification

    Verify property ownership and confirm contractor licenses and insurance if applicable

    You'll need: Proof of Property Ownership, Contractor Information and Insurance

  3. 3

    Code Compliance Plan Review

    Review of plans for WA State Building Code compliance including 24-inch frost line requirement, structural adequacy, 36-inch guard rail height, and material standards

    You'll need: Construction Plans per WA State Building Code, Foundation and Footing Specifications, Guard Rail Specifications per WA Code

  4. 4

    Permit Issuance

    Approved permit is issued and construction may begin per approved plans

  5. 5

    Foundation and Framing Inspection

    Inspector verifies footings reach 24-inch minimum depth, posts are properly set, and framing meets WA State Building Code specifications

  6. 6

    Final Inspection and Approval

    Final inspection confirms 36-inch guard rail height, 4-inch baluster spacing, all connections secure, and deck is safe for use

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Residential Deck Permit Fee$150 โ€“ $350Verified
Plan Review Fee$75 โ€“ $228Verified

Inspections Required

Verify footing depth is 24 inches minimum below finished gra

Verify footing depth is 24 inches minimum below finished grade per WA State frost line

Check posts are properly anchored and secured in deep footin

Check posts are properly anchored and secured in deep footings

Inspect footing material and bearing capacity for local soil

Inspect footing material and bearing capacity for local soil conditions

Verify guard rail height meets 36-inch Washington State Buil

Verify guard rail height meets 36-inch Washington State Building Code minimum

Check balusters spacing does not exceed 4 inches

Check balusters spacing does not exceed 4 inches

Verify proper frost protection and drainage in footing desig

Verify proper frost protection and drainage in footing design

Inspect framing connections per WA State Building Code

Inspect framing connections per WA State Building Code

Check fasteners appropriate for freeze-thaw cycles and moist

Check fasteners appropriate for freeze-thaw cycles and moisture exposure

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Spokane Building Department

Last verified: February 15, 2026

1 source referenced

Official page
City of Spokane Building Department

Verified February 15, 2026

Official page
Washington State Building Code

Verified February 15, 2026

Official page

Frequently Asked Questions

Do I need a deck permit in Spokane?
Yes. Spokane requires a deck permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does deck permit approval take in Spokane?
Processing times in Spokane vary depending on project complexity and current review volume. The process involves 6 steps. Contact Spokane Development Services for current timelines.
What documents are required for a deck permit in Spokane?
Spokane requires 6 documents including Construction Plans per WA State Building Code, Property Survey and Site Plan, Proof of Property Ownership, Foundation and Footing Specifications, and others. See the full list above for details.
What happens if I build without a deck permit in Spokane?
Building without a permit in Spokane can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my deck permit submission in Spokane?
Yes. PermitMagic generates a submission-ready packet tailored to Spokane's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a deck permit cost in Spokane?
Deck permit fees in Spokane typically range from $225 to $578, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Spokane.

Related Permits

Deck permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a deck permit packet for Spokane, Washington โ€” with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview ยท Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]City of Spokane Building Department โ€” City of Spokane Building Departmenthttps://my.spokanecity.org/building/(verified Feb 15, 2026)
  2. [2]City of Spokane Building Department โ€” Washington State Building Codehttps://my.spokanecity.org/building/(verified Feb 15, 2026)
  3. [3]City of Spokane Building Department โ€” International Residential Code Standardshttps://www.iccsafe.org/(verified Feb 15, 2026)