EV Charger Permit Fees & Costs in Spokane, Washington

Everything you need to apply for a ev charger permit in Spokane, Washington — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$233 – $462
Review time
Varies by jurisdiction
Inspections
4 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Spokane directly.

Estimated Total Fees

$233$462

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
EV Charger Permit Fee[1][2]

Residential EV charger electrical permit fees based on work scope. May increase if main service upgrade required.

$155 – $280
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$78 – $182
Estimated Total$233$462

Fees shown as ranges. Always verify the exact amount with Spokane before submission. Additional fees may apply for expedited review or resubmittals.

Avoid rejections — generate a submission-ready packet

Get a personalized EV Charger permit packet for Spokane, Washington — tailored to your project details.

  • Required forms: EV Charger Electrical Permit Application, Licensed Electrician Information, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $78–$280 estimated total
  • Step-by-step Spokane Development Services Department portal submission guide
  • Inspection prep checklist (4 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Spokane requires the following documents for this permit application.

R

EV Charger Electrical Permit Application

Completed electrical permit application for residential Level 2 EV charger (240V, 40-50 amp)

R

Electrical Load Calculation

NEC Article 625 compliant load calculation confirming panel capacity or upgrade requirements

R

Site Plan & Installation Diagram

Detailed diagram showing EVSE location, mounting height, separation from other utilities, circuit path, and GFCI location

R

Equipment Specifications & Listing

Manufacturer specifications, UL listing information, and technical manual for Level 2 EVSE device

R

Licensed Electrician Information

Contractor license information and letter indicating they will perform/inspect work to NEC standards

Permit Process

Follow these steps to submit your permit application through Spokane Development Services Department.

  1. 1

    Engage Licensed Electrician

    Hire Washington-licensed electrician to design and plan EV charger installation per NEC Article 625

    You'll need: Licensed Electrician Information

  2. 2

    Prepare & Submit Documentation

    Prepare load calculation, site plan, and equipment specifications. Submit through Spokane online portal.

    You'll need: EV Charger Electrical Permit Application, Electrical Load Calculation, Site Plan & Installation Diagram, Equipment Specifications & Listing

  3. 3

    Plan Review

    Spokane DSD reviews for NEC compliance, dedicated circuit sizing, GFCI protection, and accessibility requirements

  4. 4

    Pay Permit Fee & Receive Permit

    Pay electrical permit fee (typically $155-$280 for residential EV chargers). Permit valid for 180 days.

  5. 5

    Schedule Inspections

    Schedule rough-in inspection (before EVSE installation) and final inspection (after all connections complete)

  6. 6

    Inspection & Final Approval

    Pass electrical rough-in and final inspections. Receive inspection approval and permit sign-off.

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Spokane Development Services Department

Last verified: February 15, 2026

2 sources referenced

Official page
Portal guide
Spokane Permits Portal

Verified February 15, 2026

Official page
Official page

Frequently Asked Questions

Do I need a ev charger permit in Spokane?
Yes. Spokane requires a ev charger permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does ev charger permit approval take in Spokane?
Processing times in Spokane vary depending on project complexity and current review volume. The process involves 6 steps. Contact Spokane Development Services for current timelines.
What documents are required for a ev charger permit in Spokane?
Spokane requires 5 documents including EV Charger Electrical Permit Application, Electrical Load Calculation, Site Plan & Installation Diagram, Equipment Specifications & Listing, and others. See the full list above for details.
What happens if I build without a ev charger permit in Spokane?
Building without a permit in Spokane can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my ev charger permit submission in Spokane?
Yes. PermitMagic generates a submission-ready packet tailored to Spokane's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a ev charger permit cost in Spokane?
EV Charger permit fees in Spokane typically range from $233 to $462, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Spokane.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a ev charger permit packet for Spokane, Washington — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]Spokane Development Services DepartmentSpokane Development Services - Electrical Permitshttps://www.spokane.gov/permits(verified Feb 15, 2026)
  2. [2]Spokane Development Services DepartmentSpokane Permits Portalhttps://spokane.gov/permits(verified Feb 15, 2026)
  3. [3]Spokane Development Services DepartmentSpokane City Code - Electrical Safety Requirementshttps://www.spokane.gov/permits/electrical(verified Feb 15, 2026)
  4. [4]Spokane Development Services DepartmentSpokane EV Charger Installation Checklisthttps://www.spokane.gov/permits/ev-checklist(verified Feb 15, 2026)