Solar PV Permit Inspection Checklist in Spokane, Washington

Everything you need to apply for a solar pv permit in Spokane, Washington — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$150 – $578
Review time
Varies by jurisdiction
Inspections
4 inspections required
VerifiedLast verified: Feb 15, 20262 verified sources

Inspection Checklist (4 items)

Inspection requirements may vary by project. Always confirm specific inspection criteria with your inspector or local AHJ.

Avoid rejections — generate a submission-ready packet

Get a personalized Solar PV permit packet for Spokane, Washington — tailored to your project details.

  • Complete list of required forms and documents
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $50–$350 estimated total
  • Step-by-step Building and Code Enforcement portal submission guide
  • Inspection prep checklist (4 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Spokane requires the following documents for this permit application.

R

Engineering Plans and Specifications

Complete engineering plans for electrical and structural systems prepared by licensed PE

R

Utility Interconnection Agreement

Pre-approval or signed interconnection agreement from utility company

R

Colored Site Plan

Scaled site plan showing panel placement, electrical runs, and equipment locations

R

Module and Equipment Specifications

Technical data sheets for solar modules, inverter, and all electrical components

R

Fire Rating and Roof Certification

Roof fire rating certification and structural engineer stamp for mounting system

R

Owner Consent and Property Rights

Documentation of property owner consent and any lease/easement agreements

Permit Process

Follow these steps to submit your permit application through Building and Code Enforcement.

  1. 1

    Prepare and Submit Application

    Submit online solar installation permit application with engineering plans and site plan

    You'll need: Engineering Plans and Specifications, Colored Site Plan, Module and Equipment Specifications, Owner Consent and Property Rights

  2. 2

    Initial Review and Utility Coordination

    Building and Code Enforcement reviews application and confirms utility interconnection agreement

    You'll need: Utility Interconnection Agreement, Fire Rating and Roof Certification

  3. 3

    Plan Examination

    Detailed review of electrical plans and structural design by permit reviewers

    You'll need: Engineering Plans and Specifications, Module and Equipment Specifications

  4. 4

    Issue Permit

    Issuance of electrical permit upon successful plan review

  5. 5

    Rough Electrical Inspection

    Inspector verifies proper installation of conduit, wiring, and disconnect switches

  6. 6

    Final Electrical Inspection

    Final inspection of completed system with certification and interconnection verification

Fees and Timeline

Fee Breakdown

FeeRangeConfidence
Solar PV Permit Fee$100 – $350Verified
Plan Review Fee$50 – $228Verified

Inspections Required

Confirm all electrical connections meet NEC Article 705 requ

Confirm all electrical connections meet NEC Article 705 requirements

Verify proper DC/AC disconnects placement and labeling

Verify proper DC/AC disconnects placement and labeling

Check mounting system integrity and roof structural capacity

Check mounting system integrity and roof structural capacity

Validate utility interconnection labeling and anti-islanding

Validate utility interconnection labeling and anti-islanding protection

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

Building and Code Enforcement

Last verified: February 15, 2026

2 sources referenced

Official page
Spokane Solar Installation Permit Guide

Verified February 15, 2026

Official page
Solar Permit Requirements Checklist

Verified February 15, 2026

Official page

Frequently Asked Questions

Do I need a solar pv permit in Spokane?
Yes. Spokane requires a solar pv permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does solar pv permit approval take in Spokane?
Processing times in Spokane vary depending on project complexity and current review volume. The process involves 6 steps. Contact Spokane Development Services for current timelines.
What documents are required for a solar pv permit in Spokane?
Spokane requires 6 documents including Engineering Plans and Specifications, Utility Interconnection Agreement, Colored Site Plan, Module and Equipment Specifications, and others. See the full list above for details.
What happens if I build without a solar pv permit in Spokane?
Building without a permit in Spokane can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my solar pv permit submission in Spokane?
Yes. PermitMagic generates a submission-ready packet tailored to Spokane's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a solar pv permit cost in Spokane?
Solar PV permit fees in Spokane typically range from $150 to $578, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Spokane.

Related Permits

Solar PV permits in nearby cities

Ready to apply? Build your submission packet.

Answer a few project questions and get a solar pv permit packet for Spokane, Washington — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download