Deck Permit Fees & Costs in Spokane, Washington

Everything you need to apply for a deck permit in Spokane, Washington — documents, fees, steps, and a downloadable submission packet.

Key Facts

Permit required
Yes
Submission method
Online
Typical fee range
$225 – $578
Review time
Varies by jurisdiction
Inspections
8 inspections required
VerifiedLast verified: Feb 15, 20261 verified source

Limited Data Available

Some information on this page has not been fully verified. We're working to improve data quality. Always verify with Spokane directly.

Estimated Total Fees

$225$578

Range based on typical residential solar PV system. Actual fees depend on project valuation and system size.

Fee ComponentRangeConfidence
Residential Deck Permit Fee[1][2]

Fees based on deck square footage and complexity. Spokane charges moderate fees reflecting deeper frost requirements.

$150 – $350
Plan Review Fee[3][4]

Plan review fee is typically 50-65% of the permit fee.

$75 – $228
Estimated Total$225$578

Fees shown as ranges. Always verify the exact amount with Spokane before submission. Additional fees may apply for expedited review or resubmittals.

Generate your permit packet

Get a personalized Deck permit packet for Spokane, Washington — tailored to your project details.

  • Required forms: Contractor Information and Insurance, and more
  • Pre-filled templates: Permit Cover Sheet
  • Fee breakdown: $75–$350 estimated total
  • Step-by-step City of Spokane Building Department portal submission guide
  • Inspection prep checklist (8 items)
  • Personalized for your specific project details
Build My Permit Packet

Free to preview · Pro to download

Required Documents

Spokane requires the following documents for this permit application.

R

Construction Plans per WA State Building Code

Detailed construction plans showing deck dimensions, materials, post locations, and footing depth of 24 inches minimum per WA State Building Code frost line requirement for Spokane area

R

Property Survey and Site Plan

Survey showing property lines, deck location, setbacks from property boundaries, utility line locations, and easements

R

Proof of Property Ownership

Current deed or title document confirming property ownership

R

Foundation and Footing Specifications

Specifications showing post footings extend 24 inches minimum below finished grade per WA State frost line, footing diameter, material, bearing capacity, and frost protection details

R

Guard Rail Specifications per WA Code

Plans showing guard rails with 36-inch minimum height per WA State Building Code, balusters spaced no more than 4 inches, and secure connection details

R

Contractor Information and Insurance

Licensed contractor information and proof of liability insurance (if work will be performed by licensed contractor)

Permit Process

Follow these steps to submit your permit application through City of Spokane Building Department.

  1. 1

    Submit Permit Application

    Submit completed permit application with construction plans and site survey to City of Spokane Building Department

    You'll need: Construction Plans per WA State Building Code, Property Survey and Site Plan

  2. 2

    Ownership and Contractor Verification

    Verify property ownership and confirm contractor licenses and insurance if applicable

    You'll need: Proof of Property Ownership, Contractor Information and Insurance

  3. 3

    Code Compliance Plan Review

    Review of plans for WA State Building Code compliance including 24-inch frost line requirement, structural adequacy, 36-inch guard rail height, and material standards

    You'll need: Construction Plans per WA State Building Code, Foundation and Footing Specifications, Guard Rail Specifications per WA Code

  4. 4

    Permit Issuance

    Approved permit is issued and construction may begin per approved plans

  5. 5

    Foundation and Framing Inspection

    Inspector verifies footings reach 24-inch minimum depth, posts are properly set, and framing meets WA State Building Code specifications

  6. 6

    Final Inspection and Approval

    Final inspection confirms 36-inch guard rail height, 4-inch baluster spacing, all connections secure, and deck is safe for use

Authority Sources

Data on this page is sourced from official records published by the permitting authority. Always verify requirements directly before submitting.

City of Spokane Building Department

Last verified: February 15, 2026

1 source referenced

Official page
City of Spokane Building Department

Verified February 15, 2026

Official page
Washington State Building Code

Verified February 15, 2026

Official page

Frequently Asked Questions

Do I need a deck permit in Spokane?
Yes. Spokane requires a deck permit for this type of project. Submitting without a permit may result in fines, required removal, or complications when selling your property.
How long does deck permit approval take in Spokane?
Processing times in Spokane vary depending on project complexity and current review volume. The process involves 6 steps. Contact Spokane Development Services for current timelines.
What documents are required for a deck permit in Spokane?
Spokane requires 6 documents including Construction Plans per WA State Building Code, Property Survey and Site Plan, Proof of Property Ownership, Foundation and Footing Specifications, and others. See the full list above for details.
What happens if I build without a deck permit in Spokane?
Building without a permit in Spokane can result in stop-work orders, fines, required removal of work, difficulty selling your property, and insurance complications. It is strongly recommended to obtain proper permits before starting work.
Can PermitMagic help prepare my deck permit submission in Spokane?
Yes. PermitMagic generates a submission-ready packet tailored to Spokane's requirements, including a document checklist, workflow steps, and authority references. Start a permit plan to get your personalized packet.
How much does a deck permit cost in Spokane?
Deck permit fees in Spokane typically range from $225 to $578, depending on project scope. Fees may include building permit, plan review, and technology surcharges. Verify current fees with Spokane.

Related Permits

Ready to apply? Build your submission packet.

Answer a few project questions and get a deck permit packet for Spokane, Washington — with every document, form, and fee organized for submission.

Build My Permit Packet

Free to preview · Pro to download

Sources & Citations

All regulatory information on this page is sourced from official government publications. Always verify requirements directly with your local Authority Having Jurisdiction (AHJ) before submission.

  1. [1]City of Spokane Building DepartmentCity of Spokane Building Departmenthttps://my.spokanecity.org/building/(verified Feb 15, 2026)
  2. [2]City of Spokane Building DepartmentWashington State Building Codehttps://my.spokanecity.org/building/(verified Feb 15, 2026)
  3. [3]City of Spokane Building DepartmentInternational Residential Code Standardshttps://www.iccsafe.org/(verified Feb 15, 2026)